041014 OPERA

Information about 041014 OPERA

Published on October 19, 2007

Author: Jeremiah

Source: authorstream.com

Content

OPERA-COPRAS Brussels October 14th 2004:  OPERA-COPRAS Brussels October 14th 2004 Possible Collaborations Project Scope (I) Objectives:  Project Scope (I) Objectives OPERA Project is a four years project (divided in two phases of 24 months, the actual phase covers two years up to December 2005)… Where the main actors in PLC area are participating… To offer low-cost broadband access service to ALL European citizens using the most ubiquitous infrastructure, Power Lines… By means improving & standardising the PLC Technology in order to reduce costs and to be able to use it as a broadband technology in a massive deployment. Project Scope (II) What is PLC?:  Project Scope (II) What is PLC? PLC (Power Line Communications) is a telecommunication technology that allows to take profit of the existing electrical grid for high quality and broadband data transmission . This means that in each domestic electrical socket, the customer has availability, in addition to the electrical energy, of: Broad Band Internet Services Telephone connection Advanced services of Video and High definition TV (on test) All these services are available without having additional connections, antennas or new cables in house. An additional advantage for the Power Distribution Company is the avoidance of the “last mile” installation, the cable routings, and the ditches across our streets. Project Scope (III) Participants:  Telecom Operators • Auna ( Spain) • ONI (Portugal) • PPC (Germany) Utilities • EDF (France) • ENDESA (Spain) • ENEL Distribuzione/WIND (Italy) • IBERDROLA (Spain) • LinzAG Strom (Austria) • MVV (Germany) • Unión Fenosa (Spain) Technology Providers • Ascom (Switzerland) • DS2 (Spain) • Itran (Israel) Main.net (Israel) Universities • Open University (England) • Swiss Federal Institute of Technology (Switzerland) • University of Dresden (Germany) • University of Duisburg- Essen (Germany) • University of Karlsruhe (Germany) • University of Thessaloniki (Greece) • University Politécnica Madrid (Spain) University of Comillas (Spain) Developers and Manufactures • ADD (Spain) • Dimat (Spain) • Schneider Electric Powerline Communications (France) Eichhoff (Germany) • Elsys Design (France) • Mitsubishi (Japan) • Robotiker (Spain) • Telvent (Spain) Engineering and Consultancy Companies • Eutelis Italia ( Italy) • Enditel (Spain) • Iberdrola Ingeniería y Consultoría (Spain) • Inesc / Nov (Portugal) Other Organisations • PLCForum Association • • • Project Scope (III) Participants Technologies, specifications, other outputs that are intended to be European or global standards or may contribute to standardisation work :  Technologies, specifications, other outputs that are intended to be European or global standards or may contribute to standardisation work Our Project have into its objectives to contibute to the Standardisation of PLC sys-tems for the following issues: Functional requirements: topologies of PLC networks and system requirements (performance, QoS, network management, electric safety specifications, dimensions, target cost). Access system specification: PHY layer, MAC layer, coexistence indoor-access, MIB for NMS, PLC network/services interfaces. PLC equipment specification: specification of requirements of PLC equipment. EMC: there are only standard & compliance at national level and the objective is European level. Interface with narrow band PLC System. Those specifications will be taken to standardisation bodies and will be the basis for the manufacture of (standard) new generation PLC systems to be used in the deployment. Specific WPs addressing activities required to interface with standards bodies:  Specific WPs addressing activities required to interface with standards bodies Workpackage 5: “Specification & standardisation” Objectives To specify the requirements of the new PLC Integrated Network that will be the reference for the work of all workpackages. To drive the PLC standardisation in the competent organisations. Budget: 170 Man/months (both for Specifying and Addressing) Coordinating standardisation related activity with other IST projects:  Coordinating standardisation related activity with other IST projects Up to this moment, our only process to coordinating standardisation related activity with other IST projects either in FP6 or other Framework Programmes is the present one: COPRAS Coordination with standards bodies/industry consortia, concerned activity & involved organisations:  Coordination with standards bodies/industry consortia, concerned activity & involved organisations Standards body or industry consortium; Forecasted Contacts: CENELEC SC205A working Group 10 on PLC standardisation Work Group WG3 of the committee CISPR/I (EMC of Information technology equipment, multimedia equipment and receivers) which are developing a standard on product EMC Activities Involved: Workpackage 5 Our deliverable D59 consists in the Deliverables updating to transform them to proposal documents (final drafts) for the standardisation bodies. The Contacts have not started yet. Our Proposal documents for the standardisation bodies will be released at month 24 (End of 2005), as stated in our milestones. Standardisation Issues Addressing Specific Areas (I):  Standardisation Issues Addressing Specific Areas (I) Expected results that may concern standardization issues.: Specification of requirements of PLC System. Specification of requirements of PLC Equipment. PLC EMC aspects: measurements, disturbance voltage, radiation, immunity, approval testing… PLC de facto standard. Proposal documents for the standardisation bodies Standardisation Issues Addressing Specific Areas (II):  Standardisation Issues Addressing Specific Areas (II) Detailed Tech. & Spec. and Standards related Outputs (Deliverables): D45 Specification of PLC system requirements. D46 General specification of PLC PHY layer D47 General specification of PLC MAC layer D48 Specification of common MIB for all PLC equipment. D49 Solutions for coexistence between Access and Indoor systems D50 Specification of standard interfaces. D51 Specification of requirements of PLC equipment: Access network PLC equipment Customer premises equipment User’s terminals D52 Specification for EMC measurements to be performed. D53 Report on disturbance voltage measurement method. D56 Specifications for PLC type approval testing. D57 Specification of interfaces between home automation and PLC and between AMR and PLC systems. D58 Report on the progress of PLC standardisation. D59 Deliverables update to transform them to proposal documents (final drafts) for the standardisation bodies.

Related presentations


Other presentations created by Jeremiah

NAR 2006 08
09. 04. 2008
0 views

NAR 2006 08

Top Thrill Dragster
03. 10. 2007
0 views

Top Thrill Dragster

Chinese Proverb
04. 10. 2007
0 views

Chinese Proverb

harvey ppt
05. 10. 2007
0 views

harvey ppt

Barish Industry 06 05
09. 10. 2007
0 views

Barish Industry 06 05

springbreak3
10. 10. 2007
0 views

springbreak3

Makarsankrant
10. 10. 2007
0 views

Makarsankrant

MIR
12. 10. 2007
0 views

MIR

SSI Presentation
17. 10. 2007
0 views

SSI Presentation

Chapter4anthrax
21. 10. 2007
0 views

Chapter4anthrax

Nicaragua Santiago20050930
22. 10. 2007
0 views

Nicaragua Santiago20050930

NYTd Strategy Content Summit
27. 09. 2007
0 views

NYTd Strategy Content Summit

Bell UML in an hour
23. 10. 2007
0 views

Bell UML in an hour

Western Illinois University
02. 11. 2007
0 views

Western Illinois University

Jain History Power Point
10. 12. 2007
0 views

Jain History Power Point

Presentation e mtiaz1
23. 10. 2007
0 views

Presentation e mtiaz1

Robert Sappio FTDC 5 08 06
25. 10. 2007
0 views

Robert Sappio FTDC 5 08 06

making classroom inclusive
30. 10. 2007
0 views

making classroom inclusive

my friend Beth
02. 11. 2007
0 views

my friend Beth

MLA Citation Enhanced
28. 09. 2007
0 views

MLA Citation Enhanced

11HPC Eckrich
05. 10. 2007
0 views

11HPC Eckrich

Howard NASA Programs
15. 10. 2007
0 views

Howard NASA Programs

student chap8
04. 01. 2008
0 views

student chap8

nov200 6 molfetas
07. 01. 2008
0 views

nov200 6 molfetas

PF timing
15. 10. 2007
0 views

PF timing

dead reckon proposal
07. 01. 2008
0 views

dead reckon proposal

engageLMS
01. 10. 2007
0 views

engageLMS

ibmglobal
22. 11. 2007
0 views

ibmglobal

HIPAA TRAINING HCD
23. 10. 2007
0 views

HIPAA TRAINING HCD

Normand207
31. 12. 2007
0 views

Normand207

md cdf flier 2007 revised
23. 11. 2007
0 views

md cdf flier 2007 revised

powerpoint colorado
30. 10. 2007
0 views

powerpoint colorado

GBEP VICENZA
23. 11. 2007
0 views

GBEP VICENZA

cancer aging
16. 02. 2008
0 views

cancer aging

zhongpresentation
11. 10. 2007
0 views

zhongpresentation

Stakeholder Mtg8 May12 03
14. 02. 2008
0 views

Stakeholder Mtg8 May12 03

Olivier
13. 03. 2008
0 views

Olivier

InternationalHealthL ecture
16. 03. 2008
0 views

InternationalHealthL ecture

Athens Glocalization Paradox
20. 03. 2008
0 views

Athens Glocalization Paradox

pp3
27. 02. 2008
0 views

pp3

2101 Iliad and Odyssey
03. 04. 2008
0 views

2101 Iliad and Odyssey

BSM Tools Repository aug05
05. 10. 2007
0 views

BSM Tools Repository aug05

BEChapter 8
13. 04. 2008
0 views

BEChapter 8

Hilltop Terry
19. 10. 2007
0 views

Hilltop Terry

arena c
20. 02. 2008
0 views

arena c

Dversify
14. 04. 2008
0 views

Dversify

trade
16. 04. 2008
0 views

trade

07 09 it planning briefing
17. 04. 2008
0 views

07 09 it planning briefing

NextStep11Mar02
18. 04. 2008
0 views

NextStep11Mar02

PowerPoint 02 22 08
22. 04. 2008
0 views

PowerPoint 02 22 08

apresentacao
16. 10. 2007
0 views

apresentacao

acma brendan vernon
28. 04. 2008
0 views

acma brendan vernon

Comdex2002
07. 05. 2008
0 views

Comdex2002

bis update
30. 04. 2008
0 views

bis update

Chapter 9
02. 05. 2008
0 views

Chapter 9

PCM2004
09. 10. 2007
0 views

PCM2004

50
03. 10. 2007
0 views

50

blum
17. 10. 2007
0 views

blum

mcKee
15. 10. 2007
0 views

mcKee

peter jong
27. 03. 2008
0 views

peter jong

usjapan
10. 04. 2008
0 views

usjapan

PresidentReport Gupta October05
16. 10. 2007
0 views

PresidentReport Gupta October05

paper02
29. 09. 2007
0 views

paper02

CP12299E
22. 10. 2007
0 views

CP12299E

2005 WACD ANNUAL REPORT
15. 11. 2007
0 views

2005 WACD ANNUAL REPORT

201 Family
19. 02. 2008
0 views

201 Family

AREA II Maps Jul06
24. 10. 2007
0 views

AREA II Maps Jul06

Tangermann
17. 10. 2007
0 views

Tangermann

3B1HugoGraeme3B11July
26. 03. 2008
0 views

3B1HugoGraeme3B11July

SLA China 04
24. 03. 2008
0 views

SLA China 04

drm
21. 10. 2007
0 views

drm

Berkutova
02. 11. 2007
0 views

Berkutova

WomenetWork 0
15. 10. 2007
0 views

WomenetWork 0