26 ple edgecock

Information about 26 ple edgecock

Published on October 17, 2007

Author: Abhil

Source: authorstream.com

Content

Outline:  Outline Introduction i.e. what has happened since last year European feasibility study Proton driver superbeam developments Target Pion collection Muon front-end Muon acceleration ……..with thanks to many people from whom I’ve stolen transparencies! Introduction:  Introduction Last year: “…..or the art of [talking] for half an hour about nothing!” cut backs at CERN due to LHC largely not replaced by other labs general lack of funding This year: some signs of improvement: funding from EC FP6 + ISTC uplift in (at least) one country more positive noises from CERN management future proposals to FP6/7 work still being done……….. CARE:  CARE European Commission 6th Framework Programme: EC has defined various actions to fund many only for specific thematic priorities made substantial funds available – 17.5B€! some actions possible for PP  ESGARD Coordinated a proposal against Integrating Activities  Coordinated Accelerator Research in Europe Exploited two activities: - Networking Activities  BENE - Joint Research Activities  HIPPI CARE:  CARE 30% ~.7M€ 30% ~0.3M€ 30% ~0.45M€ 90% 3.6M€ 90% 3.6M€ 25% ~1M€ 65% ~5M€ Other Possible FP6 Actions:  Other Possible FP6 Actions Design Studies: - 1st round (March 2004): EUROTeV EURISOL - 2nd round ( ): NuFactDS New JRAs under CARE New and Emerging Science and Technology  both discussed later UK Funding Uplift:  UK Funding Uplift From UK Gov, mainly due to initiative started by Ken Peach Good news: £21M from PPARC Bad news: LC beam delivery: £9M Cockcroft Institute: £7M Oxford/RH Centre: £2M UKNF: £2M MICE: £1M PPARC £7.5M OST CCLRC Cockcroft Institute:  Discussed later & WG3 European Feasibility Study:  European Feasibility Study CERN Yellow Report Published 2004: “ECFA/CERN Studies of a European Neutrino Factory Complex”, CERN-2004-002 Chapter on the machine  European Feasibility Study European Feasibility Study:  European Feasibility Study Proton Driver:  Proton Driver CERN proton driver: SPL Number of changes: politically technically See Haseroth WG3 SPL:  SPL CERN proton complex increase in protons ultimate L for LHC LHC L upgrade SB to Frejus driver for EURISOL/BB driver for NF SPL R&D:  SPL R&D Collaboration/funding: HIPPI: CARE JRA - R&D of the technology for high intensity pulsed proton linear accelerators up to an energy of 200 MeV - 9 labs - 11.1M€ + 3.6M€ (EC) for 5 years (2004-2008) IPHI collaboration: - 3 MeV RFQ ISTC: - DTL with magnetic focusing (3-40 MeV) - DTL with focusing by RF quadrupoles (DTL-RFQ) (3-40 MeV) - Coupled Cavity DTL (40-100 MeV) - $1550 total - all prototypes delivered by summer 2006 SPL R&D:  SPL R&D 3 MeV test stand RAL Test Stand:  RAL Test Stand “5MW” test stand also planned at RAL Builds on existing test stand for current ISIS upgrade Work done for the ESS Main aim is a further ISIS upgrade Directly relevant to Neutrino Factory Complementary to CERN: - different chopper, frequency, etc - more generic Also participating in HIPPI Close collaboration with CERN developing Beam >2007 See Findlay WG3 Target Studies:  Target Studies Three programmes: Shock studies of solid targets TT2A experiment HARP See Fabich/Catanesi Plenary Kirk/Bennett WG3 Shock Studies:  Shock Studies Electron beam tests: Electron beam welding machine Only realistic possibility for lifetime test Correct energy density Only surface effect First test done Foil Shock Studies:  Shock Studies Second test under consideration Improved experimental setup & diagnostics Results also relevant to T2K Shock Studies:  Shock Studies Proton beam tests: Correct energy density available from PS & at ISOLDE Lifetime tests difficult PS will be used for mercury Solid target tests already done at ISOLDE Further tests planned, upgraded instrumentation Also relevant to T2K and CNGS HARP:  HARP Precise measurement of for hadrons Input for: - Neutrino Factory & superbeam - atmospheric neutrino flux - hadron production models - MiniBooNE, K2K, LSND experiments Data taking in 2001 and 2002 420M physics triggers, 1.5 to 15 GeV/c, many targets Since then: understanding detector First physics distributions: winter conferences 2004 Latest results: this week……….. Pion Collection - Horns:  Pion Collection - Horns Baseline collector in CERN layout: horn Standard for conventional neutrino beams Two horns required to achieve focussing needed for the Neutrino Factory See Fabich WG3 Horns:  Horns Three main issues being studied: - lifetime due to pulsing: 300/600kA at 50Hz - heating/lifetime due to beam - optimisation of parameters for physics Muon Front-end:  Muon Front-end CERN “baseline”: all 88MHz linear channel target and horn 15 m decay channel 7.2 m phase rotation cooling (6.4 m/cell) Basically unchanged for 2 years RAL Front-end Studies:  RAL Front-end Studies Two front-ends being studied at RAL: - inverse phase rotation chicane - cooling ring Both currently being optimised (pre-GRID!) Funnelling:  Funnelling Split proton beam on to “4” targets + horns “Funnel” pions into same decay channel FODO focussing using quads, rather solenoid focussing Pions Muons Front-end R&D:  Front-end R&D Contributions to three projects: - MuScat - MuCool - MICE Two others in Europe: - Frictional cooling - Laser ionisation of muonium MuScat:  MuScat Measurement of muon MCS as input to - cooling simulations - MICE - Geant Two data-taking runs at TRIUMF – 2000 & 2003 Data analysis taken longer than expected(!): - high precision experiment - small fractions of a few people First results this week See Murray Plenary MICE:  MICE European contributions Beamline and infrastructure: UK, Switzerland Tracking detectors: Italy, Switzerland, UK Particle-id detectors: Belgium, Italy Coils: Italy, UK RF-power: Switzerland, UK Magnetic field measurements: Netherlands Software: Italy, Switzerland, UK Muon Acceleration:  Muon Acceleration Some activity on RLAs: - at CERN some time ago - Saclay more recently More recently, much activity on FFAGs: - Saclay: beam dynamics studies - CERN: development of FFAG simulations beam dynamics and lattices studies - RAL: studies towards an isochronous, 16 turn, 8-20 GeV FFAG See Meot WG3 Electron Model FFAG:  Electron Model FFAG Electron model of a non-scaling FFAG Much work done (by one person!)  parameters for 10-20 MeV machine 15m in circumference Increasing EU participation: - high current p-driver - medical applications - ADS - ion acceleration - industry Have a candidate host lab: Daresbury - two possible injectors - some associated infrastructure Investigating funding, e.g. FP6 Conclusions:  Conclusions Financial situation has improved Hopefully, this will continue! Focus on a number of projects to attract more people Proton driver: - very healthy - two test stands under development Target and collection: - TT2A - solid target shock studies - tests/simulations of horns - First HARP results soon Front-end: - First MuScat results - MICE progressing well Acceleration: - Focus on e-model FFAG

Related presentations


Other presentations created by Abhil

oyster culture
03. 01. 2008
0 views

oyster culture

laser
02. 05. 2008
0 views

laser

electricity project
10. 10. 2007
0 views

electricity project

CAPM Nt
28. 04. 2008
0 views

CAPM Nt

futures
16. 04. 2008
0 views

futures

601presentation
29. 09. 2007
0 views

601presentation

RJ Iris Equity Seminar
03. 10. 2007
0 views

RJ Iris Equity Seminar

bubbles
03. 10. 2007
0 views

bubbles

weather jeopardy spanish
07. 10. 2007
0 views

weather jeopardy spanish

pc03
09. 10. 2007
0 views

pc03

IVACS2006 handout
09. 10. 2007
0 views

IVACS2006 handout

06 collaborating to improve ell
10. 10. 2007
0 views

06 collaborating to improve ell

lj
13. 10. 2007
0 views

lj

4bTheNobelPrizeinChe mistry2004
15. 10. 2007
0 views

4bTheNobelPrizeinChe mistry2004

Lecture 1 Darwin vs God
15. 10. 2007
0 views

Lecture 1 Darwin vs God

NCMA Presentation
22. 10. 2007
0 views

NCMA Presentation

endangeredspecies ppt
12. 10. 2007
0 views

endangeredspecies ppt

mtom
24. 10. 2007
0 views

mtom

scaling
19. 10. 2007
0 views

scaling

p10
23. 10. 2007
0 views

p10

2007 Applicant Demographics
30. 10. 2007
0 views

2007 Applicant Demographics

WNV
21. 10. 2007
0 views

WNV

cells
20. 11. 2007
0 views

cells

conclusiones V1 sep28 2007
25. 10. 2007
0 views

conclusiones V1 sep28 2007

ap Cold War 07
23. 12. 2007
0 views

ap Cold War 07

10 Review
29. 12. 2007
0 views

10 Review

Isle Royale Simulation
01. 01. 2008
0 views

Isle Royale Simulation

structengr
04. 01. 2008
0 views

structengr

2005 02 07 Could Al Qaeda Win
07. 01. 2008
0 views

2005 02 07 Could Al Qaeda Win

td06030
15. 10. 2007
0 views

td06030

I DESC Japan
09. 10. 2007
0 views

I DESC Japan

section5 lec2
13. 11. 2007
0 views

section5 lec2

205w
03. 01. 2008
0 views

205w

Ceiling Fan Sales Training
23. 10. 2007
0 views

Ceiling Fan Sales Training

v war stuntman
19. 02. 2008
0 views

v war stuntman

HIMARS ENGLISHLANGUAGE
04. 03. 2008
0 views

HIMARS ENGLISHLANGUAGE

ING NYC Marathon 2007
12. 03. 2008
0 views

ING NYC Marathon 2007

K ICMCI as an NGO
20. 03. 2008
0 views

K ICMCI as an NGO

CPB750 TXT
03. 04. 2008
0 views

CPB750 TXT

Unit 4 Japan s Geography 1
07. 04. 2008
0 views

Unit 4 Japan s Geography 1

neither shall the sword
27. 02. 2008
0 views

neither shall the sword

solka fml 4 15 06 dj final
15. 11. 2007
0 views

solka fml 4 15 06 dj final

coface07
13. 04. 2008
0 views

coface07

AMurcko
17. 04. 2008
0 views

AMurcko

FACS borenstein Dec03
22. 04. 2008
0 views

FACS borenstein Dec03

mhtb
07. 11. 2007
0 views

mhtb

ç
10. 10. 2007
0 views

ç

Retroviruses105
15. 10. 2007
0 views

Retroviruses105

Krajweski Chapter 15 16
07. 05. 2008
0 views

Krajweski Chapter 15 16

0916 Branch 0730
02. 10. 2007
0 views

0916 Branch 0730

Lec5 3rd
30. 04. 2008
0 views

Lec5 3rd

pp angel cristian
01. 10. 2007
0 views

pp angel cristian

Guy Wormser
23. 10. 2007
0 views

Guy Wormser

From the Inside Looking Out
02. 05. 2008
0 views

From the Inside Looking Out

rcdt 061127 05
10. 10. 2007
0 views

rcdt 061127 05

CAISModelGreenSchool
07. 03. 2008
0 views

CAISModelGreenSchool

Ordinamento Germania
16. 11. 2007
0 views

Ordinamento Germania

20041005 Adam Posen
09. 10. 2007
0 views

20041005 Adam Posen

A71 Quezada
01. 11. 2007
0 views

A71 Quezada

CAMET Report
22. 10. 2007
0 views

CAMET Report

workbench
08. 10. 2007
0 views

workbench

melderichtlinien
05. 10. 2007
0 views

melderichtlinien

APAN E culturePresentation 1 21
30. 10. 2007
0 views

APAN E culturePresentation 1 21

ANGELImplementationa tLCCC
01. 10. 2007
0 views

ANGELImplementationa tLCCC

Options Questionnaire 12 11 02
29. 10. 2007
0 views

Options Questionnaire 12 11 02

cancer nutri
04. 10. 2007
0 views

cancer nutri

SYSTEM 3 presentation
27. 09. 2007
0 views

SYSTEM 3 presentation

Souza parallel 3 1
12. 10. 2007
0 views

Souza parallel 3 1

Memorial 2007
18. 10. 2007
0 views

Memorial 2007

SIEl 2006
24. 10. 2007
0 views

SIEl 2006