3 MOVE

Information about 3 MOVE

Published on November 6, 2007

Author: Carlton

Source: authorstream.com

Content

Slide1:  NISN Forum San Diego, Ca 5/22/07 Core NASA MOVE Project Team:  Core NASA MOVE Project Team Project Manager Agency lead Contracting Officers Technical Representative (COTR) MOVE Board Chairperson Site Leads Represents respective home Centers and Satellite locations Full participation in all MOVE Project requirement development, Review and Verification activities Weekly Project Telecons MOVE Board Voting members consist of MOVE Site Leads Dispositions all change requests to MOVE baselines Establish MOVE Project internal policies and procedures Background:  Background Mission voice switch systems Support NASA Critical Spacecraft Operations Performs Switching, Conferencing, and Monitoring of critical voice services Typical Keyset users Flight Controllers Safety Officers Network Controllers Mission Managers Mission operations Background (Cont.):  Background (Cont.) Mission voice switch equipment overview Switch subsystem Builds mission voice conferences Interfaces dedicated Wide Area Network (WAN) voice services Interfaces local site keysets Keyset (End Instrument) Provides talk/listen/monitor conference capability “Pick up” style displays provide access to any number of desired conferences Local System Administrator (LSA) Console Voice Controller interface for configuring the switch and keysets, user profiles, conferences, defining reports, and alarm definitions Typical Mission Voice Configuration:  Typical Mission Voice Configuration Generic MOVE Site Architecture:  Generic MOVE Site Architecture Purpose of MOVE:  Purpose of MOVE Replace aging Site custom mission critical voice switch systems with standardized systems over a five year period and provide product support/maintenance for up to an additional 10 years. Benefits to NASA:  Benefits to NASA Volume purchase Modified COTS Reduced logistics Reduced maintenance Scalability Single Firm Fixed Price Contract Commonality Standards based Fixed price catalogue ordering Interchangeable Spares Funding Responsibilities:  Funding Responsibilities HQ/MOVE Project Initial delivery of Switch/LSA sub-systems System critical spares 10 years maintenance Removal of old switch Initial training Digital recorders MOVE Site Keysets Local facilities Keyset cabling Head/Handsets MOVE Contract Award :  MOVE Contract Award Frequentis USA, Rockville, Maryland Awarded September 2006 Contract start date February 1, 2007 ISO 9001 Certified 15 year period of performance 5 year Basic plus Site Options 10 year maintenance per Site Indefinite Delivery Indefinite Quantity (IDIQ) FUSA Work Statement Overview:  FUSA Work Statement Overview Provide for the design, acquisition, development, integration, test, delivery and maintenance of all hardware, firmware and software components which comprise the MOVE system Shipment and delivery of the MOVE equipment Assist in the installation and checkout with the exception of the keysets System Highlights:  System Highlights Multi-functional LRUs VoIP Keysets T-1 Keysets Virtual Keysets (Type-C) Follow me Color Keyset displays Remote Keyset Capability Window XP Window 2003 Oracle Database Standardized protocols All Digital IDIQ:  IDIQ 15 year firm fixed price catalogue of equipment and services Equipment Keysets (all types) Switch expansion Line Replaceable Units (LRU) LSA Subsystem Switch Subsystems Services Senior Engineer Junior Engineer Field Engineer Software Engineer Maintenance:  Maintenance 10 years per Site Hardware, Firmware, and Software covered on Agency-wide contract with individual site period of performances (Site Acceptance + 10 years) FUSA responsible for all depot level maintenance and repair 10 Calendar day turnaround for repair or replace Fault isolation to LRU performed by trained NASA Site personnel 24x7x365 Answer Line Support Required escalation process Configuration Management:  Configuration Management FUSA responsible for configuration management and baseline of all LRUs, Software, Firmware, and Docs for the life of the contract Includes IDIQ FUSA Training:  FUSA Training On Site training part of delivery Training courses Maintenance training course System operations course User keyset course Train the trainer philosophy Material can be reproduced Sessions may be video taped FUSA Documentation Deliverables :  FUSA Documentation Deliverables Project level Project Activity Reports Critical Spare List Test Plans Installation Plan Management Plan Site Level Site Installation Docs System Technical Docs Acceptance Test Procedures Acceptance Test Reports Training Package FUSA Programmatic Deliverables:  FUSA Programmatic Deliverables Project Level Technical Interchange meeting SDR/CDR Check-Point Prototypes First Article Tests Factory Acceptance Test Escrow Agreement Weekly Status Reviews Master Schedule Site Level Site Technical Interchange meeting Site Survey System Architecture Review Basic Contract Deliveries :  Basic Contract Deliveries GSFC Equipment Ship Date 3-2-08 MSFC Equipment Ship Date 6-26-08 JSC Equipment Ship Date 8-07-08 Contract Option Sites:  Contract Option Sites JPL WSGT STGT GRGT MCC-M GDSCC MILA CDSCC WFF MDSCC DFRC HAE VAFB DSPA KSC Exercising an Option:  Exercising an Option No later than 60 days prior to FUSA Option Start Date The MOVE Project process for exercising a Contract Option is currently under development but will include: Site readiness verification Facilities Cabling Support Transfer of keyset funds to GSFC Procurement Due 75 days prior to FUSA Option Start Date Slide22:  MOVE Option Sites Slide23:  MOVE Option Sites (Cont.) MOVE Project Contacts:  MOVE Project Contacts GSFC, HQ, WSC, GRGT, WFF, MILA Katie Poole MSFC Doug Fooshee JSC, MCC-M Al Wylie JPL, DSN Sites Roger Cortez Hanger AE, VAFB Tuan Doan KSC, DSPA Tim Springstroh MOVE Contracting Officer Geoff Sage Business Manager Kris Beverly Project Manager Dan Duffy Summary:  Summary All Sites responsible for Keyset funding Costs have been provided to MOVE Site Leads Critical Design Review week of June 11th Equipment deliveries begin in FY-08 10 year FUSA maintenance per Site MOVE.NASA.GOV Slide26:  MOVE Schedule Slide27:  MOVE GSFC Schedule Slide28:  MOVE MSFC Schedule Slide29:  MOVE JSC Schedule MOVE Locations:  MOVE Locations

Related presentations


Other presentations created by Carlton

Consumer
19. 11. 2007
0 views

Consumer

first06b
02. 10. 2007
0 views

first06b

Nyberg yeast
08. 11. 2007
0 views

Nyberg yeast

udd
10. 12. 2007
0 views

udd

Lab Setup
05. 11. 2007
0 views

Lab Setup

drire
15. 11. 2007
0 views

drire

KRISTAL2006 04
20. 11. 2007
0 views

KRISTAL2006 04

DHCREALV2
22. 11. 2007
0 views

DHCREALV2

modern slow dance
23. 11. 2007
0 views

modern slow dance

Ethnic Geography Part II
23. 11. 2007
0 views

Ethnic Geography Part II

P Naming Elephants Presentation
26. 11. 2007
0 views

P Naming Elephants Presentation

ancientrome
31. 10. 2007
0 views

ancientrome

FarmtoBusiness
27. 12. 2007
0 views

FarmtoBusiness

Polymorphism
31. 12. 2007
0 views

Polymorphism

pruning avon landscape school
03. 01. 2008
0 views

pruning avon landscape school

Clinical
04. 01. 2008
0 views

Clinical

5 Unit 12
04. 01. 2008
0 views

5 Unit 12

WhittakerPaper
07. 01. 2008
0 views

WhittakerPaper

CEROS TechEnterprise 2005
07. 01. 2008
0 views

CEROS TechEnterprise 2005

ISU Trondheim 2006
07. 12. 2007
0 views

ISU Trondheim 2006

Parks Decsion Tree
28. 11. 2007
0 views

Parks Decsion Tree

deussen
02. 01. 2008
0 views

deussen

Onion handout only2006
07. 11. 2007
0 views

Onion handout only2006

SalahuddinAminuzzaman
25. 12. 2007
0 views

SalahuddinAminuzzaman

1 2006 parasitology definitions
24. 10. 2007
0 views

1 2006 parasitology definitions

mktrec
24. 02. 2008
0 views

mktrec

voyager tutorial
27. 02. 2008
0 views

voyager tutorial

MP10SpecialRelativit y2
06. 11. 2007
0 views

MP10SpecialRelativit y2

Maher Creativity 2007 08 14
28. 11. 2007
0 views

Maher Creativity 2007 08 14

Lifeline v4c
31. 10. 2007
0 views

Lifeline v4c

Travel Health
27. 03. 2008
0 views

Travel Health

Musical 1
02. 11. 2007
0 views

Musical 1

Outline2
13. 11. 2007
0 views

Outline2

wac2004ronblum
13. 04. 2008
0 views

wac2004ronblum

Agrofuels Driving Climate Change
26. 11. 2007
0 views

Agrofuels Driving Climate Change

2007 05 09bbh download
26. 10. 2007
0 views

2007 05 09bbh download

Bartenders Karen Palmersheim
11. 12. 2007
0 views

Bartenders Karen Palmersheim

Dynamic Licensing
06. 11. 2007
0 views

Dynamic Licensing

jose nov 04
30. 10. 2007
0 views

jose nov 04

1183379282 IIIA N S results
26. 10. 2007
0 views

1183379282 IIIA N S results

CLS Euro pres
02. 01. 2008
0 views

CLS Euro pres

cours5
01. 11. 2007
0 views

cours5

Homestake DOSSECC 6 2006b
03. 12. 2007
0 views

Homestake DOSSECC 6 2006b

ritt
29. 10. 2007
0 views

ritt

true fri pps2
28. 12. 2007
0 views

true fri pps2

27 Piro ops
30. 10. 2007
0 views

27 Piro ops

KUS5 trebilcock
01. 12. 2007
0 views

KUS5 trebilcock

Subsea experience 1
07. 11. 2007
0 views

Subsea experience 1

pred desvios
28. 12. 2007
0 views

pred desvios

Eric Van Heck
12. 12. 2007
0 views

Eric Van Heck