Chiasson0306 4

Information about Chiasson0306 4

Published on December 30, 2007

Author: Woofer

Source: authorstream.com

Content

GEOTHERMAL HEAT PUMP SYSTEMS: CLOSED-LOOP DESIGN CONSIDERATIONS :  GEOTHERMAL HEAT PUMP SYSTEMS: CLOSED-LOOP DESIGN CONSIDERATIONS Andrew Chiasson Geo-Heat Center, Oregon Institute of Technology Outline:  Outline Geothermal options - decision tree System construction Ground heat exchanger materials and layout Inside the building System design Geothermal loop design Pumping The open-loop option General Decision Tree:  General Decision Tree Unique Opportunity (gray water, etc.) Groundwater for open loop, existing well use or need Hard rock, good quality groundwater Enough land for horizontal loop, good soil for excavation Good conditions for pond loop, interested owner Good conditions for vertical loop Other HVAC System Hybrid Evaluate resource obtain permits, agreements, etc. Good disposal options Aquifer test, groundwater chemistry Evaluate standing column well Pond thermal evaluation Test bores, Thermal conductivity test DESIGN DEVELOPMENT Annual unbalanced loads, AND/OR thermal storage opportunity GHP Pros/Cons:  GHP Pros/Cons Advantages Energy efficiency Simplicity Low maintenance Water heating No auxiliary heat (in most cases) No outdoor equipment Packaged equipment Environmentally “green” Lowers peak demand Low life-cycle cost Allows more architectural freedoms Better zone comfort control GHP Pros/Cons:  GHP Pros/Cons Disadvantages First (capital) cost However, incentives, energy-savings mortgages or loop-leasing are some ways of off-setting costs Limited qualified designers Geographically limited contractors Supply/demand => higher vendor markups System Construction What does the Loop Do?:  System Construction What does the Loop Do? The closed-loop is a heat exchanger, where fluid flowing through the loop exchanges heat with the earth The earth is a solid material! => thermal storage effects Synonyms: Ground (or ground-loop heat exchanger), earth energy exchanger, ground (or earth) coupling, borehole field, loop field, Geoexchange (GX) Design goal is to size the loop to provide fluid temperatures to the heat pump(s) within the design target range (usually 35oF – 90oF) to meet thermal loads of the building System Construction:  System Construction All underground piping is high-density polyethylene (HDPE) with thermally-fused joints (according to ASTM standards) Field installation procedures have been standardized by IGSHPA DX systems: Copper refrigerant lines are direct buried Standards and operating experiences do not exist to the level of water-source heat pumps System Construction Vertical Loops:  System Construction Vertical Loops Installed by standard drilling methods Auger: soils, relatively shallow holes Mud-rotary: soft sediments and sedimentary rocks Air-rotary: soft to hard relatively dry rocks Air-hammer: hard rock Cable-tool: hard rock, deep holes (slow drilling) Sonic drilling: high drilling rates in most materials Loop (or borehole heat exchanger) is rolled off a reel into borehole Borehole is grouted from the bottom to the top with a “tremie pipe” to insure a good seal Standard bentonite grout Thermally-enhanced grouts (bentonite/sand mixture) System Construction Vertical Loops:  System Construction Vertical Loops Installing vertical loop Mixing grout System Construction Vertical Loops:  System Construction Vertical Loops Inserting u-tube & tremie-pipe With geo-clips Drilling fluids flowing from hole as grout is pumped in System Construction Vertical Loops:  System Construction Vertical Loops 150 – 300 ft typical depth Reverse-return piping arrangement 1 bore per circuit u-tubes can range in diameter from ¾ to 1 ¼ inch (1-inch is most common) System Construction Horizontal Loops:  System Construction Horizontal Loops 4 – 6 ft burial depth System Construction Horizontal Loops:  System Construction Horizontal Loops System Construction Pond Loops:  System Construction Pond Loops System Construction Pond Loops:  System Construction Pond Loops Geo Lake Plate HDPE Pipe Copper Pipe System Construction Flushing/Purging:  System Construction Flushing/Purging The loop must be designed so it can be flushed to remove debris and entrained air upon commissioning or at any time necessary Install provisions (shut-off valves, hose ports) on the supply and return runouts Large systems use one or more vaults Smaller systems can have valves on headers in mechanical room System Construction Building Interior:  System Construction Building Interior (from Water Furnace) System Construction Building Interior:  System Construction Building Interior (from Water Furnace) System Construction Building Interior:  System Construction Building Interior (from Water Furnace) System Construction Building Interior – Hydronic Systems:  System Construction Building Interior – Hydronic Systems Using water-to-water heat pumps for hot water System Construction Building Interior – Hydronic Systems:  System Construction Building Interior – Hydronic Systems Using water-to-water heat pumps Baseboards Fan Coil Units Max. output water temperatures are about 120oF (cast iron radiators generally designed for 160-180oF) System Construction Building Interior – Outdoor Air:  System Construction Building Interior – Outdoor Air Several options Introducing too cold or too hot outdoor air directly to a heat pump decreases it’s capacity => but, increasing heat pump capacity may result in too much air flow In commercial buildings, some type of heat recovery system is generally recommended Water-water heat pumps tied to the ground loop can be used to pre-condition outdoor air Loop Design Important Parameters Vertical Closed Loop:  Loop Design Important Parameters Vertical Closed Loop Average Thermal Conductivity Undisturbed Earth Temperature Loop Design Important Parameters Horizontal Closed Loop:  Loop Design Important Parameters Horizontal Closed Loop Various loop configurations => Borehole resistance concept is replaced by trench resistance Trench depth dictates average earth temperature! => Twinter, Tsummer Loop Design:  Loop Design RULES OF THUMB ARE NOT RECOMMENDED FOR FINAL DESIGN Why? The earth is a solid material, so effects of run time are important in the design!! => Heat pump run hours must be considered Loop design for residential buildings is generally handled differently than commercial buildings Why? Internal gains in commercial buildings, load diversity, etc. affect annual heat rejection/extraction to the ground, so the building life-cycle must be considered Loop Design Know the Loads Profile of the Building:  Loop Design Know the Loads Profile of the Building Zone loads determine the heat pump size (a zone is the area controlled by a thermostat) In U.S. & Canada, accepted practice is to size heat pump equipment based on the peak cooling load, and should NOT be oversized; want to minimize on-off cycling, maximize humidity control If necessary, supplemental electric heat can make up the difference Block loads (greatest sum of hourly zone loads) determine the loop size Block loads depend on the building “diversity” For example, residential buildings have no diversity, a school with wings may have a 50-60% diversity Loop Design Overview of Procedure:  Loop Design Overview of Procedure Building Loads (from loads calculation software, residential may use spreadsheets) Peak hour Design month run fraction (usually from degree days) Ground thermal properties Design lengths: IGSHPA method Proprietary software (usually employs IGHSPA method) Ground-loop software that considers: Peak hour Monthly run fraction Annual full load hours OR monthly loads Ground thermal properties Design lengths (NO UNIFIED METHOD): ASHRAE method Proprietary software Loop Design Design Software:  Loop Design Design Software Loop Design Thermal Conductivity:  Loop Design Thermal Conductivity Thermal conductivity is generally dependent on density, moisture content, mineral content Soils: Clays (15% moisture) 0.4 - 1.1 Btu/hr-ft-F Clays (5% moisture) 0.3 - 0.8 Sands (15% moisture) 0.6 - 2.2 Sands (5% moisture) 0.5 – 1.9 Rocks: Granite 1.3 – 2.1 Btu/hr-ft-F Basalt 1.2 – 1.4 Limestone 1.4 – 2.2 Sandstone 1.2 – 2.0 Shale 0.8 – 1.4 Grouts: Standard bentonite 0.42 Thermally-enhanced 0.85 – 1.40 Loop Design Thermal Conductivity:  Loop Design Thermal Conductivity An in-situ thermal conductivity test (or thermal response test) is recommended on commercial jobs Loop Design Hybrid Systems:  Loop Design Hybrid Systems Unbalanced loads over annual cycle A school in a cold climate with no summer occupancy, or office/school in warm climate A supplemental piece of equipment (or another process) handles some of the building space load Boiler Solar collector array Cooling tower Pond or swimming pool Snow melting system Refrigeration load Loop Design Hybrid Systems:  Loop Design Hybrid Systems Loop Design Hybrid Systems:  Loop Design Hybrid Systems Need software for analysis => current ASHRAE research project to study design and control Example School in Northern U.S. Loop Design Loop Lengths for Planning:  Loop Design Loop Lengths for Planning Generalized loop lengths for planning purposes NOT recommended for final designs => use software Pumping :  Pumping Flow requirement for heat pumps is 2 to 3 gpm/ton Flow requirement for 1-inch u-tubes is similar in order to maintain turbulent flow Total loop flow rate should be based on BLOCK LOADS, not total heat pump capacity Desire just enough flow to maintain turbulence, especially at peak hours => check Reynolds Number (Re > 2300) More turbulence means more convection heat transfer, but more pumping energy Pumping :  Pumping If freezing temperatures are expected from heat pumps, loop should be freeze-protected (temperature drop across heat pumps of 10oF should be assumed) Use as little antifreeze as necessary! Types of antifreeze: Propylene glycol Ethanol Methanol CPTherm (new product) Need to check viscosities at low temperatures => impacts pumping energy Pumping :  Pumping ASHRAE grading system: A-Excellent 0.05 hp/ton B-Good 0.05-0.075 hp/ton C-Mediocre 0.075-0.1 hp/ton D-Poor 0.1-0.15 hp/ton In other words, pumping kW should be <10% of total system demand Reduce friction losses by: Reverse-return piping Parallel circuits Use larger-diameter pipe in deeper bores Pumping :  Pumping Flow management Variable speed drives in central systems Sub-central pumping Individual flow centers if possible Constant flow pumping NOT recommended De-centralized loop fields in buildings with diverse floor plans Open Loop Option :  Open Loop Option Advantages : Low cost, especially for large loads and residential applications that need a drinking water well Water well drilling technology is well-established Stable source temperature Standing column well option in certain circumstances Disadvantages : Water quality dependent Scaling Corrosion Iron bacteria, well fouling Water disposal Laws and regulations Permits, water rights Summary :  Summary Closed Loops: vertical vs. horizontal vs. pond Vertical loops generally have highest first cost Consider practical considerations for loop installation => hybrid systems, open loop option Think system: interior HVAC components, outdoor air Efficiency and lower cost through design Final designs should use design software

Related presentations


Other presentations created by Woofer

Power Point Basics
19. 06. 2007
0 views

Power Point Basics

Intro to Latin America
03. 10. 2007
0 views

Intro to Latin America

Currall Energy Nano
01. 10. 2007
0 views

Currall Energy Nano

Welcome to the Aztecs
01. 11. 2007
0 views

Welcome to the Aztecs

halloween safety tips
02. 11. 2007
0 views

halloween safety tips

us army vehicle identific
07. 11. 2007
0 views

us army vehicle identific

Ebbes Personalisierung
16. 11. 2007
0 views

Ebbes Personalisierung

Lecture 17
22. 11. 2007
0 views

Lecture 17

The Chemistry of Life
02. 01. 2008
0 views

The Chemistry of Life

ShortageofGirlsinChi na
12. 10. 2007
0 views

ShortageofGirlsinChi na

Masis
22. 10. 2007
0 views

Masis

AEP3 PPT Generic
27. 11. 2007
0 views

AEP3 PPT Generic

mod3 lecture 5b
05. 10. 2007
0 views

mod3 lecture 5b

vesseltracking
22. 10. 2007
0 views

vesseltracking

carynong
04. 10. 2007
0 views

carynong

svt formules sponsor
23. 10. 2007
0 views

svt formules sponsor

911 sp
26. 02. 2008
0 views

911 sp

Ballistics
28. 02. 2008
0 views

Ballistics

Gosnold IASPEI
22. 10. 2007
0 views

Gosnold IASPEI

Eco driving 4web
21. 03. 2008
0 views

Eco driving 4web

TerraCottaWarriors SDaly
26. 03. 2008
0 views

TerraCottaWarriors SDaly

2nd session6
27. 03. 2008
0 views

2nd session6

15 Man on the Moon
07. 04. 2008
0 views

15 Man on the Moon

switchroute1
01. 01. 2008
0 views

switchroute1

Nijenrode230507
28. 03. 2008
0 views

Nijenrode230507

2004intl USC Kumar
30. 03. 2008
0 views

2004intl USC Kumar

ernest adams
11. 12. 2007
0 views

ernest adams

5 Project01 04
04. 03. 2008
0 views

5 Project01 04

RoxanaBojariu
09. 04. 2008
0 views

RoxanaBojariu

frontline
10. 04. 2008
0 views

frontline

Mexico HOME BUIDERS ingles 8feb
13. 04. 2008
0 views

Mexico HOME BUIDERS ingles 8feb

Flowers lab
14. 12. 2007
0 views

Flowers lab

David Smith 20061102
14. 04. 2008
0 views

David Smith 20061102

AML Business Requirements neut
17. 04. 2008
0 views

AML Business Requirements neut

Preparing the Way Power Point
18. 06. 2007
0 views

Preparing the Way Power Point

prelims 2005
19. 06. 2007
0 views

prelims 2005

PORTS
19. 06. 2007
0 views

PORTS

Perkins IV Workshop 2007 draft 2
19. 06. 2007
0 views

Perkins IV Workshop 2007 draft 2

pascal
19. 06. 2007
0 views

pascal

Open House Presentation0412
19. 06. 2007
0 views

Open House Presentation0412

Presentation Rvbg
18. 06. 2007
0 views

Presentation Rvbg

Process Algebra as Modelling
18. 06. 2007
0 views

Process Algebra as Modelling

Presentation MA 02
18. 06. 2007
0 views

Presentation MA 02

prospectus mta nespl
18. 06. 2007
0 views

prospectus mta nespl

orientation 2006
19. 06. 2007
0 views

orientation 2006

ç04çDNSèä
23. 10. 2007
0 views

ç04çDNSèä

U9B2
24. 02. 2008
0 views

U9B2

Presentazione CorsoE
18. 06. 2007
0 views

Presentazione CorsoE

Presentazione CorsoA
18. 06. 2007
0 views

Presentazione CorsoA

Filatova
11. 10. 2007
0 views

Filatova

lemonade 0
29. 10. 2007
0 views

lemonade 0

MTScrapbook1
26. 07. 2007
0 views

MTScrapbook1

pb
19. 06. 2007
0 views

pb

Gut Feeling Mikels RIP
06. 08. 2007
0 views

Gut Feeling Mikels RIP

slides na3
27. 09. 2007
0 views

slides na3

Special Areas of Conservation
28. 12. 2007
0 views

Special Areas of Conservation

Braulio2
22. 10. 2007
0 views

Braulio2

Open House Pix
19. 06. 2007
0 views

Open House Pix

Legnaro Variola
04. 01. 2008
0 views

Legnaro Variola

PNUD SNU Agenda Nacional
19. 06. 2007
0 views

PNUD SNU Agenda Nacional

Plan Empleados SAGARPA
14. 11. 2007
0 views

Plan Empleados SAGARPA