E97 Presentation Sewers

Information about E97 Presentation Sewers

Published on November 1, 2007

Author: Junyo

Source: authorstream.com

Content

The Feasibility of Vacuum Sewer Implementation In Venice, Italy :  The Feasibility of Vacuum Sewer Implementation In Venice, Italy Martin Felices, Lauren Goodfellow, Jay Johnston, Sonali Maheshwary Advisors: Prof. John Zeugner, Ing. Fabio Carrera Sponsor: Alan Hassett, Oak Hill Company Ltd. Purpose of the Study:  Purpose of the Study To examine the feasibility of implementing the HIFLOTM vacuum sewer into the historical and marginal areas of Venice. To collect data and gather information about vacuum sewer implementation in Venice. To determine feasibility on a cost, applicability and social impact level. Current Sewerage System Components:  Current Sewerage System Components Sedimentation tanks located within house foundations separates the light and heavy sewage Collettori large brick or cement troughs run underneath the streets Sbocchi sewage outlets located along the canal walls Fognature Design:  Fognature Design Current Failures of the Sewerage System in Venice:  Current Failures of the Sewerage System in Venice Plan of Renovation :  Plan of Renovation City is divided into two areas Repairs spanned over a duration of 23 years Estimated cost: £ 818 billion Vacuum Sewers:  Vacuum Sewers HIFLOW TM:  HIFLOW TM Patented by Alan Hassett High-tech features -Shallow pipelines -Air tight -High-lift -OTS hardware Section Breakdown:  Section Breakdown Test Sites:  Test Sites Santa Maria Formosa Model for upscale Historical area Residential with some tourism Santa Marta Request of the city Residential Option 1:  Option 1 Vacuum piping within the canals surrounding the entire island Option 1 (continued):  Option 1 (continued) Interfaced at sbocchi where collettori decant into canals Option 2:  Option 2 Vacuum piping alongside the collettori Sewage valves placed at interceptor points as manholes in the streets Option 3:  Option 3 Vacuum piping goes up underneath the house foundations Sewage valves placed in the sedimentation tanks Santa Maria Formosa Schematics:  Santa Maria Formosa Schematics Option 1 Option 2 Option 3 Santa Maria Formosa Chart:  Santa Maria Formosa Chart Santa Maria Formosa Costs:  Santa Maria Formosa Costs Option 1 £372 million Option 2 £1.06 billion Option 3 £1.4 billion Slide18:  Santa Marta Schematics Option 2 Option 3 Santa Marta Chart:  Santa Marta Chart Slide20:  Santa Marta Costs Option 2 £290 million Option 3 £534 million Upscale Implementation:  Upscale Implementation Water consumption is equivalent to the sewage flow Collection tanks range from 13,000 to 20,000 liters 24 collection stations placed accordingly Cost Analysis of Upscale Implementation :  Cost Analysis of Upscale Implementation Social Impacts:  Social Impacts Survey feedback The sewerage system is failing (69%) Sewage treatment is desired (82%) A slight increase in noise would be acceptable (62%) A raise in taxes is opposed (77%) Relay Network System:  Relay Network System Piping terminates at Ferrovia and Stazione Marittima Ready to be pumped out of the city Total cost for network: £57 Billion Designed for worst-case scenario Pumping off of Venice:  Pumping off of Venice Conclusions:  Conclusions Conclusions (continued):  Conclusions (continued) Option determination matrix was made Total costs: Recommendations for Further Study:  Recommendations for Further Study Relay network within Venice Pumping sewage to the mainland

Related presentations


Other presentations created by Junyo

workshop evaporative
08. 11. 2007
0 views

workshop evaporative

Black Holes
29. 11. 2007
0 views

Black Holes

The Precious Panda in Dan
01. 12. 2007
0 views

The Precious Panda in Dan

CHAPTER 6
07. 12. 2007
0 views

CHAPTER 6

HellenisticWorld
29. 10. 2007
0 views

HellenisticWorld

introcicero
30. 10. 2007
0 views

introcicero

The Catholic Counter Reformation
30. 10. 2007
0 views

The Catholic Counter Reformation

Sadowski Thin Films Legnaro2006
31. 10. 2007
0 views

Sadowski Thin Films Legnaro2006

EhrlichCharlemagne1
01. 11. 2007
0 views

EhrlichCharlemagne1

New Septic Tank Sizing
06. 11. 2007
0 views

New Septic Tank Sizing

ETOMS
14. 11. 2007
0 views

ETOMS

GDC Video Game Graphics
15. 11. 2007
0 views

GDC Video Game Graphics

Learning
23. 11. 2007
0 views

Learning

groundwater 101
17. 12. 2007
0 views

groundwater 101

VL24 25januar2006PPadj
24. 12. 2007
0 views

VL24 25januar2006PPadj

SoCalWaterDialogue
28. 12. 2007
0 views

SoCalWaterDialogue

Child Study Movement
28. 12. 2007
0 views

Child Study Movement

Autotrader 1416
19. 11. 2007
0 views

Autotrader 1416

EXLP Sample 5
31. 12. 2007
0 views

EXLP Sample 5

W 31BodyParagraphs
02. 01. 2008
0 views

W 31BodyParagraphs

Biomass part 1 2
03. 01. 2008
0 views

Biomass part 1 2

ch8Jan99
04. 01. 2008
0 views

ch8Jan99

Actuation and Control System
04. 01. 2008
0 views

Actuation and Control System

bisnovaty kogan 1
13. 11. 2007
0 views

bisnovaty kogan 1

YDL 2007 final slides
10. 12. 2007
0 views

YDL 2007 final slides

Mugabe
07. 01. 2008
0 views

Mugabe

Sensors for Robots 3
07. 01. 2008
0 views

Sensors for Robots 3

20021010 1600C
27. 09. 2007
0 views

20021010 1600C

Chp5 part1
06. 11. 2007
0 views

Chp5 part1

media 26044 en
21. 11. 2007
0 views

media 26044 en

1 COMPOUND
16. 11. 2007
0 views

1 COMPOUND

20074 HCompanionAnimalUpda te
19. 11. 2007
0 views

20074 HCompanionAnimalUpda te

Lin Erda 2
04. 10. 2007
0 views

Lin Erda 2

High Yield 2005
24. 02. 2008
0 views

High Yield 2005

Chapter09
27. 02. 2008
0 views

Chapter09

Chp5 part2
06. 11. 2007
0 views

Chp5 part2

11 02 01Quality improvement
13. 04. 2008
0 views

11 02 01Quality improvement

meta models unification
29. 10. 2007
0 views

meta models unification

Qiaogj
14. 11. 2007
0 views

Qiaogj

Foders 060323
01. 10. 2007
0 views

Foders 060323

EncodinginLTM
17. 12. 2007
0 views

EncodinginLTM

Scheinin
25. 12. 2007
0 views

Scheinin

06 Burkard
28. 11. 2007
0 views

06 Burkard

TenNecessities
02. 01. 2008
0 views

TenNecessities

Probhodini KnowYourProjs
06. 12. 2007
0 views

Probhodini KnowYourProjs

Jiping Xie
06. 11. 2007
0 views

Jiping Xie

Purchasing Train
23. 11. 2007
0 views

Purchasing Train