FMA Summits Staying Ahead of the Curve

Information about FMA Summits Staying Ahead of the Curve

Published on August 4, 2014

Author: fmasummits

Source: authorstream.com

Content

Staying Ahead of the Curve: Staying Ahead of the Curve IFM Outsourcing pushes the envelope on energy savings Chris Pesek, Managing Director Integrated Facilities Management, JLL PowerPoint Presentation: 2 PowerPoint Presentation: 3 Partner Companies 5 Energy reduction 38% Annual energy savings $4.4M Energy efficiency ideas vetted 60+ Final projects recommended 8 Iterative design process 8 mos. The New Standard Cost-Effective Greenhouse Gas Reductions via Whole-Building Retrofits PowerPoint Presentation: 4 # 1 Concern: Risk of Underperformance 93% of CEOs say energy and sustainability is highly important 42% of C-level executives say they spend over $10 million in energy costs annually Today’s Corporate Real Estate Environment PowerPoint Presentation: Step #1 – Start with the no cost/ low cost PowerPoint Presentation: 6 Financial Client Reduces Energy Consumption W ithout Capital First year outsourcing facilities management 2.5M SqFt corporate campus ENERGY STAR score of 36 for corporate campus 7% reduction in total energy consumption in first year all from no-cost operational changes 10% reduction in total energy consumption after first two years PowerPoint Presentation: Step #2 – Invest in specialized t alent PowerPoint Presentation: 8 Energy Management Program Facilities Energy Manager Energy Champions (Operating Engineers ) Operations Manager OR Senior Facilities Manager Client ProSite Energy Assessments help clients cut energy costs by 10 to 20%.: 9 Virtual Energy Assessment Energy & Sustainability Assessment ASHRAE Level I, II and III audits LEED requirements Local City/State Compliance requirements ProSite Energy Assessments help clients cut energy costs by 10 to 20%. ROI of an Energy Manager: ROI of an Energy Manager Year 1 Year 2 Year 3 Year 4 Year 5 Cumulative ROI (%) 63% 433% 195% 133% 160% 135% Simple Payback 1.58 0.23 0.51 0.75 0.63 0.74 Manufacturing Client – 20M SqFt (Office / Manufacturing) 146% Average ROI PowerPoint Presentation: Step #3 – Invest in technology PowerPoint Presentation: Benefits Time 2002 2003 2004 2005 2006 2007 25% 20% 15% 10% 5% 0% Year One 6% Year Two 4% Year Three 3% Year Four 2% Year Five 2% 17% in 5 years IFM & Engineering Services Value: Maintenance Optimization Operational Savings Infrastructure Life Cycle Asset Optimization Traditional Energy Savings Performance 12 PowerPoint Presentation: 13 Benefits Time 2007 2008 2009 2010 2011 2012 2013 2014 25% 20% 15% 10% 5% 0% Year One 9% Year Two 6% Year Three 4% Year Four 4% Year Five 4% Energy Manager Enhanced Energy Savings Performance 19% in 3 years Energy & Sustainability Services IFM & Engineering Services Value: Maintenance Optimization, Operational Savings, Infrastructure LCAM PowerPoint Presentation: 14 Specialized Expertise Architecture – Systems – Operations – People ROI Based Decisions Making Predictive Maintenance SMART Building Technology Energy & Sustainability Services IFM & Engineering Services Value: Maintenance Optimization, Operational Savings, Infrastructure LCAM Analytics & Technology Enabled Energy Performance Benefits Time 2007 2008 2009 2010 2011 2012 2013 2014 25% 20% 15% 10% 5% 0% 27% in 5 years Year One 9% Year Two 6% Year Three 4% Year Four 4% Year Five 4% Energy Manager IntelliCommand PowerPoint Presentation: Industry's only end-to-end smart solution for 24/7 remote monitoring and control SMART Building Technology Continual commissioning Cloud based remote monitoring Command Center SME diagnostic analysis Finds inefficiencies that are undetectable without IntelliCommand Work order processing Technician dispatching Providing Value in 90 days Payback typically between 12 – 18 months IntelliCommand Consumer Product Client, 13 building, 3.2 MSF Each building now saving 8%-15% energy consumption Delivering value in 90 days, payback in 12 – 16 months 20-40 additional building installations Smart Building Technology: Smart Building Technology 16 A Case Study Client Need “ C ommand center” type technology for their LEED Platinum building F ocus on continuous commissioning M easurement and verification of building performance. $86,436 in annualized savings Continued cost avoidance with IntelliCommand monitoring building operations Increased reaction time of problems with the 360 work order system Results LEED Platinum New Building IntelliCommand identify several potential sources of inefficiencies in the building: VFD control logic failure Space temperature deviation Simultaneous heating and cooling Sensors out of range Equipment running out of occupancy “We want to know that the client has a problem before the client knows that they have a problem. We can now work on a temperature problem before the occupants even get warm! If IntelliCommand can do this much retro-commissioning on a brand new building, can you even imagine what it could do on an old building?” - Keith Kaiser, Manufacturing Client PowerPoint Presentation: SMART Building Technology Specialized Expertise Architecture Systems Operations People Predictive Maintenance ROI Based Decisions Making 17 Staying Ahead of the Curve 17 Energy Manager Thank you: Thank you

Related presentations


Other presentations created by fmasummits

Nortec
09. 03. 2014
0 views

Nortec

Brochure FFS6
21. 11. 2017
0 views

Brochure FFS6