HydropowerProjects in Nepal

Information about HydropowerProjects in Nepal

Published on December 6, 2007

Author: Funtoon

Source: authorstream.com

Content

Hydropower Projects in Nepal:  Hydropower Projects in Nepal D Bhattarai Deputy Director General Department of Electricity Development Ministry of Water Resources Slide2:  Nepal in Region Country Profile:  Country Profile Area : 147,181 km2 Population : 2,32,14,681 (2001) GDP : 5.9 B US$ (2003) Average annual flow : 225 Billion CM Theoretical generation capacity : 83,000 MW Economically feasible capacity : 44,000 MW Present installed capacity (hydro) : 590 MW Slide4:  Major River Basins and Hydropower Projects in Nepal Slide5:  Private Sector Projects SN Project (MW) Promoter Status 1. Khimti-1 (60) HPL Completed 2. Upper Bhote Koshi (36) BKPC Completed 3. Indrawati-3 (7.5) NHPC Completed 4. Chilime (20) CPC Completed Piluwa (3) AVHDC Completed Syange (0.18) LEDCO Completed Sunkoshi (2.6) SHPL Completed Chaku (1.5) APN Completed Hydropower Projects : Nepal:  Hydropower Projects : Nepal Upper (335), Arun III (402) & Lower Arun (308) Upper Tamakoshi (309) Upper Karnali (300) Karnali Chisapani(10800) Kali Gandaki 2(660) Budhi Gandaki (600) Dudh Koshi (300)) Slide7:  Project Features : Lower Arun Eastern Development Sankhuwasabha Run-of-River (Daily Pondage) 308 MW ( 4x77 MW ) 212.2 m 171.5 m3/Sec 10.5 m Underground 15.2 km / 8.4m 2275.9 GWh 1436.5 GWh 25 km from Arun-3 damsite 100 km (220 kV) US$ 481.4 million (1990) Location Region : District : Type : Installed Capacity : Net Rated Head : Design discharge : Weir Height : Power House Type : Power Tunnel Length & Dia : Average Annual Energy : Firm Energy : Access Road Length : Transmission Length : Project Cost : Status: Pre-Feasibility Study, 1990 Slide8:  Project Features : Arun 3 Eastern Development Sankhuwasabha Pondage Run-of-River 402 MW ( 6 x 67 MW ) 303.8 m 320 m3/sec 68 m Underground Underground 11.5 km/7.5 m 2891 GWh 1558 GWh 116.8 km 432.2 km(220 kV double crt.) US$ 859.09 million (1995) Location Region : District : Type : Installed Capacity : Gross Head : Design Discharge : Dam Height : Power House Type : Desander Type : Tunnel Length & Dia. : Average Annual Energy : Firm Energy : Access Road Length : Transmission Length : Project Cost : Status: Detailed Design Study Slide9:  Project Features : Upper Arun Location Region : District : Type : Installed Capacity : Net rated Head : Dam Height : Design Discharge : Power House Type : Tunnel Length & Size : Average Annual Energy : Access Road Length : Transmission Length : Project Cost : Eastern Development Sankhuwasabha Run-of-River (Daily Pondage) 335 MW ( 4 x 83.75 ) 492 m 37 m 78 m3/Sec Underground 7.84 km & 5.5 m 2050 GWh 45 km from Arun-3 damsite 200 km (220 kv) US$ 508.8 million (1991) Status: Feasibility Study, 1991 Slide10:  Upper Arun Arun 3 Lower Arun Slide11:  Project Features : Dudh Koshi Location Region : District : Type : Installed Capacity : Net Rated Head : Design Discharge : Dam Height : Live Storage : Power House Type : Average Annual Energy : On Peak Firm Energy : Off Peak Firm Energy : Access Road Length : Transmission Length : Project Cost : Eastern Development Okhaldunga, Khotang Storage 300 MW (5x60 MW) 249.3 m 136 m3/s 180 m 442.1 million cubic metre Underground 1806 GWh 552 GWh 920 GWh 43.2 km 93 km (220kv Duble crt.) 135 km (220 kv Single crt.) US$ 690.1 million (1998) ` Status: Feasibility Study, 1998 Slide12:  Location Dudhkoshi Hydropower Project (300 MW) Slide13:  Project Features : Upper Tamakoshi Eastern Region Dolakha PROR 309 MW 820 m 44 m3/Sec 177 m Surface 7170 m 3470 GWh 61 km 47 km (220 kV) US$ 340 million (2005) Location Region : District : Type : Installed Capacity : Net Rated Head : Design Discharge : Dam Height : Power House Type : Tunnel Length : Average Annual Energy : Access Road Length : Transmission Length : Project Cost : Status: Feasibility Study, 2005 Slide14:  Upper Tamakoshi Hydropower Project (309 MW) Slide15:  Project Features : Budhi Gandaki Central/Western Development Dhadhing/Gorkha Storage 600 MW ( 4 x150 MW ) 185 m 430 m3/s 225 m 2755 million cubic meter Rockfill with inclined core Underground 276 m /12m 2495 GWh 2.5 km 65 km (220 kv) US$ 774 million (1983) Location Region : District : Type : Installed Capacity : Net Head : Design Discharge : Dam Height : Live storage : Dam Type : Power House Type : Tunnel Length & Dia : Average Annual Energy : Access Road Length : Transmission Length : Project Cost : Status: Pre-Feasibility Study, 1984 Slide16:  Location Budhi Gandaki Hydropower Project Slide17:  Project Features : Kali Gandaki 2 Western Region Nawalparsi and Tanahu Storage 660 MW (6 x 110 MW) 128.3 m 585 m3/Sec 177 m Surface 322 m /6 m 3470 GWh 20 km 40 km (220 kv) US$ 772 million (1985) Location Region : District : Type : Installed Capacity : Net Rated Head : Design Discharge : Dam Height : Power House Type : Tunnel Length & Dia : Average Annual Energy : Access Road Length : Transmission Length : Project Cost : Status: Pre-Feasibility Study, 1985 Slide19:  Project Features : Upper Karnali Location : Type : Installed Capacity : Gross Head : Design Discharge : Weir Height Power House Type : Desander Type : Tunnel Length & Dia. : Average Annual Energy : Firm Energy : Access Road Length : Transmission Length : Project Cost : Mid/Far Western Region Run-of-River (Pondage) 300 MW 141 m 236 m3/s 27 m Underground Surface 2.2 km & 11.35 m 1915 GWh 1159 GWh 22 km 215 km (220 kv) US$ 454.3 million (1998) Status: Feasibility Study 1998 Slide20:  Location Upper Karnali Project Slide21:  Project Features : Karnali (Chisapani) Mid-Western Development Bardiya/Achham Storage 10800 MW ( 18 x600 MW ) 1390 m3/s 270 m 16.2 billion cubic meter Rockfill with inclined core Underground 276 m /12m 20842 GWh 2.5 km 300 km (765 kV to India) US$ 4890 million (1989) Location Region : District : Type : Installed Capacity : Average Discharge : Dam Height : Live storage : Dam Type : Power House Type : Tunnel Length & Dia : Average Annual Energy : Access Road Length : Transmission Length : Project Cost : Status: Pre-Feasibility Study, 1984 Slide22:  Karnali (Chisapani) Multipurpose Project Slide23:  Thank You

Related presentations


Other presentations created by Funtoon

Marketing Mix 4ps
10. 10. 2007
0 views

Marketing Mix 4ps

manners 1
26. 06. 2007
0 views

manners 1

Telecom Seminar 5 20 06
18. 04. 2008
0 views

Telecom Seminar 5 20 06

nuti
10. 04. 2008
0 views

nuti

ch04
07. 04. 2008
0 views

ch04

Anthrax and Pan Flu scenario
30. 03. 2008
0 views

Anthrax and Pan Flu scenario

Software Development Survey
27. 03. 2008
0 views

Software Development Survey

tts
26. 03. 2008
0 views

tts

Tsamboulas
21. 03. 2008
0 views

Tsamboulas

eie1103
18. 03. 2008
0 views

eie1103

Fluid and Electrolyte
02. 01. 2008
0 views

Fluid and Electrolyte

lvmh
26. 06. 2007
0 views

lvmh

Sodium And Water Balance
04. 01. 2008
0 views

Sodium And Water Balance

dot nyc workshop
27. 09. 2007
0 views

dot nyc workshop

Christmas Greetings 02
02. 10. 2007
0 views

Christmas Greetings 02

people around you
03. 10. 2007
0 views

people around you

Impressionismus
12. 10. 2007
0 views

Impressionismus

Pres Feulefack Zeller
29. 11. 2007
0 views

Pres Feulefack Zeller

Project Lead The Way
07. 12. 2007
0 views

Project Lead The Way

OHSummarize Sept2003
22. 08. 2007
0 views

OHSummarize Sept2003

SC tudor timeline
22. 08. 2007
0 views

SC tudor timeline

RDML Sharp MINWARA
07. 11. 2007
0 views

RDML Sharp MINWARA

discogenic lbp
17. 12. 2007
0 views

discogenic lbp

How can I miss you
24. 12. 2007
0 views

How can I miss you

hoeslywhyte
28. 12. 2007
0 views

hoeslywhyte

A I in the Military
29. 12. 2007
0 views

A I in the Military

Othello Slide Show
02. 11. 2007
0 views

Othello Slide Show

Day1Session10
07. 01. 2008
0 views

Day1Session10

StarryM 4
22. 08. 2007
0 views

StarryM 4

lhj Tudor Sailors
22. 08. 2007
0 views

lhj Tudor Sailors

elec ppt
21. 11. 2007
0 views

elec ppt

World Internet Project Media
23. 12. 2007
0 views

World Internet Project Media

martinez
26. 02. 2008
0 views

martinez

IndiaSinceIndepencen ce
28. 02. 2008
0 views

IndiaSinceIndepencen ce

march frames consumer
26. 06. 2007
0 views

march frames consumer

Manoj
26. 06. 2007
0 views

Manoj

MADHUSHALA
26. 06. 2007
0 views

MADHUSHALA

E Newsletter Aug2006
26. 06. 2007
0 views

E Newsletter Aug2006

Leipzig 02
26. 06. 2007
0 views

Leipzig 02

lecture2 CS598HL
26. 06. 2007
0 views

lecture2 CS598HL

lecture21
26. 06. 2007
0 views

lecture21

lecture13
26. 06. 2007
0 views

lecture13

Lecture 10 Reliability
26. 06. 2007
0 views

Lecture 10 Reliability

13411
23. 11. 2007
0 views

13411

AFD 061206 049
22. 08. 2007
0 views

AFD 061206 049

Elizabeth Suti
03. 12. 2007
0 views

Elizabeth Suti

Mo0PC06 02 Sekar Sari
02. 01. 2008
0 views

Mo0PC06 02 Sekar Sari

corso Haccp
20. 11. 2007
0 views

corso Haccp

nw mn cropping system
04. 10. 2007
0 views

nw mn cropping system

RLEP 2 Overview Bart Graham
13. 11. 2007
0 views

RLEP 2 Overview Bart Graham

himinhvelfingin
14. 11. 2007
0 views

himinhvelfingin

Real time2
22. 08. 2007
0 views

Real time2

le amiche di sergio
26. 06. 2007
0 views

le amiche di sergio

tudor monarchs
22. 08. 2007
0 views

tudor monarchs

daphne OMAN feb04
22. 08. 2007
0 views

daphne OMAN feb04

PickMaster 2 10 Ext Feb 25
07. 01. 2008
0 views

PickMaster 2 10 Ext Feb 25