India and Power

Information about India and Power

Published on January 21, 2008

Author: Penelope

Source: authorstream.com

Content

Slide1:  Dr. Kamal Kant Dwivedi Counselor (S&T) Embassy of India Washington DC, 20008 India at a Glance:  India at a Glance Area : 3.287 million sq. km. Population : 1.03 billion GDP : $ 500 billion ($ 3 trillion in PPP) (Grew by 8.2% in 2003 and by 2020 it is set to grow to $ 2 trillion) Installed capacity : 120,000 MW Annual demand growth : 10-12% Projected demand by 2012 : 212,000 MW (estimated cost $ 200 billion) Energy output : 421.6 mtoe (563 in 2007 & 724 in 2012) Total consumption : 501.9 mtoe Grid size : over 200,000 ckm transmission lines over 5 billion ckm distribution lines Consumption/person : 494 kg of oil equivalent Slide3:  Approximately : 1,20,000 MW Slide4:  GROWTH PROFILE OF POWER SECTOR Slide9:  Hydro Power Potential of India Note on potential: Estimates of Small Hydro potential vary. According to one estimate, it could exceed 10,000 MW. Grid quality power potential from wind, small hydro and biomass is estimated to be about 50,000 MW. Renewable energy potential of India :  Renewable energy potential of India Source : http://mnes.nic.in/ach1.htm Slide11:  Solar Energy India receives solar energy equivalent to over 5000 trillion KWhr/year, which is far more than the total energy consumption of the country. The daily average solar energy incident over India varies from 4 -7 KWhr/m2 depending upon the location. Slide12:  Wind Power Program There is an estimated Gross Potential of 45,000 MW Centre for Wind Energy Technology has been established. Wind resource Map is given here (w/m2 = Watt per square meter): Energy Resources:  Energy Resources NUCLEAR POWER PROGRAMME :  NUCLEAR POWER PROGRAMME India has been pursuing a 3-stage Nuclear Power Program. The first stage - Pressurized heavy water reactors (PHWRs) and associated fuel cycle facilities. The second stage - Fast breeder reactors (FBRs) backed by reprocessing plants and plutonium based fuel fabrication plants. The third stage - thorium-uranium-233 cycle. Utilization of thorium. Presently, 14 Nuclear Power Plants are operational in India with a total capacity of 2770 MWe. Nine more reactors are under construction, which will increase the capacity by 4460 MWe, including 6 pressurized heavy water reactors, two light water reactors and one fast breeder reactor. Slide15:  New initiatives for Nuclear Power With new initiatives, it is planned to generate 20000 MWe of Nuclear Power by the year 2020. Advanced Heavy Water Reactor (AHWR) Compact High Temperature Reactor (CHTR) - non-grid based units Accelerator Driven System (ADS) – Thorium based sub-critical Systems Slide16:  New Technologies (For non-conventional energy sources) The Ministry of Non-Conventional Energy Sources (MNES) is implementing programs on Chemical Sources of Energy, Hydrogen Energy, Alternative/Bio-fuels for Surface Transportation Geothermal Energy and Ocean Energy. As part of these programs, a number of research, development and demonstration projects have been taken up through various research and educational institutions, universities, national laboratories and the industry. Bridging the gap:  Bridging the gap With technological development, the gap between demand and supply of power is increasing. In order to bridge the gap and ensure adequate power supply, Indian Government is taking several steps: Development of new and efficient technologies Institutional reforms Fiscal incentives Private participation The Road Ahead:  The Road Ahead Increasing the production of coal and electricity Accelerated exploration of hydrocarbons Increase efficiency in power sector Demand management through technologies, processes and appliances Increased use of renewable energy sources Promotion of information technology International Cooperation:  International Cooperation Hydrogen Partnership Methane to Markets Partnership Fuel cell technology Nanotechnology initiatives Carbon sequestration Gas hydrates Photovoltaics Slide20:  Contact : [email protected]

Related presentations


Other presentations created by Penelope

7E Acids and Alkalis
22. 01. 2008
0 views

7E Acids and Alkalis

522 bioremediation
19. 01. 2008
0 views

522 bioremediation

MOLLUSKS 4 13 07
08. 01. 2008
0 views

MOLLUSKS 4 13 07

paper liners that work
10. 01. 2008
0 views

paper liners that work

Nazroo
11. 01. 2008
0 views

Nazroo

partnership
12. 01. 2008
0 views

partnership

N95 Respirator Training
13. 01. 2008
0 views

N95 Respirator Training

CISSIP Bahamas
15. 01. 2008
0 views

CISSIP Bahamas

schiffman08
17. 01. 2008
0 views

schiffman08

4 Unit 11
17. 01. 2008
0 views

4 Unit 11

06sw2aslides
18. 01. 2008
0 views

06sw2aslides

rastogi slides
23. 01. 2008
0 views

rastogi slides

HND203 Mail Routing Mastery
04. 02. 2008
0 views

HND203 Mail Routing Mastery

futureofgadgets2006
04. 02. 2008
0 views

futureofgadgets2006

TheCeramicsIndustry
11. 02. 2008
0 views

TheCeramicsIndustry

ifpte2002plenary
09. 01. 2008
0 views

ifpte2002plenary

ChesapeakeBayProject Web
15. 01. 2008
0 views

ChesapeakeBayProject Web

Doha Cotton feb05
25. 01. 2008
0 views

Doha Cotton feb05

turningtorso
25. 01. 2008
0 views

turningtorso

federal estate gift tax
28. 01. 2008
0 views

federal estate gift tax

outline5
14. 02. 2008
0 views

outline5

beowulf
18. 02. 2008
0 views

beowulf

consumerbehavior
28. 01. 2008
0 views

consumerbehavior

Compton
29. 02. 2008
0 views

Compton

notes week12 priv tech
31. 01. 2008
0 views

notes week12 priv tech

Surrealist ethnography
03. 03. 2008
0 views

Surrealist ethnography

gapped summary 2005
08. 03. 2008
0 views

gapped summary 2005

WEDDING
05. 02. 2008
0 views

WEDDING

fy2006 04 tourism ecom impact
14. 03. 2008
0 views

fy2006 04 tourism ecom impact

Hazan Netart Seoul 2004
19. 03. 2008
0 views

Hazan Netart Seoul 2004

Benchmarking for ITE 06
21. 03. 2008
0 views

Benchmarking for ITE 06

week 8 logistics processes 2006
24. 03. 2008
0 views

week 8 logistics processes 2006

TBC Overview
07. 02. 2008
0 views

TBC Overview

Travel Seminar 02072008
07. 04. 2008
0 views

Travel Seminar 02072008

Business An$wers Only
08. 04. 2008
0 views

Business An$wers Only

ziegler
24. 01. 2008
0 views

ziegler

gc06 7
15. 04. 2008
0 views

gc06 7

pptgame
12. 02. 2008
0 views

pptgame

Passage b
17. 04. 2008
0 views

Passage b

Terry Young FEI OC China 5 9 07
22. 04. 2008
0 views

Terry Young FEI OC China 5 9 07

Altec Group Internet
24. 04. 2008
0 views

Altec Group Internet

Dr Sachin Chaturvedi
07. 05. 2008
0 views

Dr Sachin Chaturvedi

PD2
07. 02. 2008
0 views

PD2

temporal reasoning CAA 04 12
02. 05. 2008
0 views

temporal reasoning CAA 04 12

SECCHI STEREOswg04v6
22. 01. 2008
0 views

SECCHI STEREOswg04v6

TheCaseforPro LifeDems
10. 01. 2008
0 views

TheCaseforPro LifeDems

UTIL WaterConservationTips 03 06
03. 03. 2008
0 views

UTIL WaterConservationTips 03 06

ch10 1
13. 01. 2008
0 views

ch10 1

GetCleanPresentation
22. 01. 2008
0 views

GetCleanPresentation

COTAR Nov02 ReportAPSEPG2002
23. 01. 2008
0 views

COTAR Nov02 ReportAPSEPG2002

CurrentTrendsGlassRe cycling
09. 01. 2008
0 views

CurrentTrendsGlassRe cycling

BIC
17. 01. 2008
0 views

BIC

celle
07. 03. 2008
0 views

celle

bodewits
16. 01. 2008
0 views

bodewits