Lean Six SigmaATL011706

Information about Lean Six SigmaATL011706

Published on June 19, 2007

Author: Alien

Source: authorstream.com

Content

“Lean Six Sigma: Will it Work with ERP?:  'Lean Six Sigma: Will it Work with ERP? By G. L. (Jerry) Kilty, CFPIM, CIRM [email protected] 727 725-7674 Agenda:  Agenda Overview of Lean Manufacturing andamp; Six Sigma Strategies for MTS/MTO ERP: Planning andamp; Scheduling Impact Paperwork Impact Backflushing Conclusions Overview Lean & Six Sigma:  Overview Lean andamp; Six Sigma Lean Manufacturing:  Value Value Stream Flow Pull Perfection Lean Manufacturing Process Management:  Process Management Customer Product/ Services Function A Function B Function C Process 1 Process 2 Process 3 Objectives Measures Lean Means Speed:  Lean Means Speed The Lean Metric: Cycle Efficiency Value Stream Map to Find the 20% Waste The Major Lean Improvement Tools Pull Systems Setup Reduction Total Productive Maintenance Cycle Efficiency:  Cycle Efficiency Process Cycle Efficiency = Value Added Time / Total Lead Time Cycle Efficiency:  Cycle Efficiency Typical Fabrication 10% Assembly 15% Continuous Mfg. 30% World Class 25% 35% 80% Six Sigma: The Power of Culture:  Six Sigma: The Power of Culture Engagement of CEO andamp; PL Managers 1% of workforce receive 4 Weeks Training (Black Belt) Black Belts are Expected to Contribute $250,000 to $1,000,000 Increased Operating Profit per Year Level of Investment to Profit Return “Belts”:  'Belts' Master Black Belt Black Belt Green Belts White Belts Sigma Levels:  Sigma Levels Level 6 5 4 3 2 1 Defects per Million 3.4 233 6,210 66,807 308,537 690,000 Sigma Levels:  Sigma Levels Level 6 5 4 3 2 1 Yield 99.9997% 99.977% 99.379% 93.32% 69.2% 31% Six Sigma CSF’s:  Six Sigma CSF’s Customer Centricity Financial Results Management Engagement Resource Commitment Execution Infrastructure Culture Change The Principle of Lean Six Sigma:  The Principle of Lean Six Sigma ' The activities that cause the customer’s critical-to-quality issues and creates the longest time delays in any process offer the greatest opportunity for improvement in cost, quality, capital, and lead time.' The Lean Six Sigma Secret:  The Lean Six Sigma Secret Identify the 'Hidden Factory Costs' Non Value-Added Costs Any Process Six Sigma Quality Focus Rapid Improvement Requires Both, Lean andamp; Six Sigma Strategies for MTS/MTO:  Strategies for MTS/MTO Slide17:  Volume Variety 1 2 3 4 Job Shop Batch MTS Repetitive Flow MTO Lean Strategies MTS:  Lean Strategies MTS MTS Environments are Best Suited For Lean Strategies Constant Repeatable Demand High Volume of Standard Products Replenishment Systems can be Planned in Advanced and Synchronized Lean Strategies MTO:  Lean Strategies MTO Not the Best Suited for Lean Aim towards Configuration Design Changes Planning BOM Mass Customization Value Added Analysis Set-Up Reduction Slide20:  Volume Variety 1 2 3 4 Job Shop Batch MTS Repetitive Flow MTO ERP: Planning & Scheduling Impact:  ERP: Planning andamp; Scheduling Impact Supply Chain Stages :  Supply Chain Stages Multiple Dysfunction Semi-Functional Enterprise Integrated Enterprise Extended Enterprise Multiple Dysfunction:  Multiple Dysfunction Supplier Supplier Purchasing Sales/Mktg Prod Cntrl Logistics Distribution Customer Customer Semi-Functional Enterprise:  Semi-Functional Enterprise Supplier Customer Customer Supplier Purch. Log. Sales/Mktg Prod. Cntrl. Dist. Integrated Enterprise:  Integrated Enterprise Supplier Customer Customer Supplier Purch. Log. Sales/Mktg Prod. Cntrl. Dist. ERP Extended Enterprise:  Extended Enterprise Suppliers’ suppliers Supplier Customers Nucleus Firm. Customers’ customers Networked Information Flow Classic Benefits of ERP:  Classic Benefits of ERP Reduced Inventory (FG, WIP, RAW) Increased Productivity Reduced Cycle Times Increased Cash-to-Cash Cycle Time Increased Flow and Availability of Information Reduced Costs Slide28:  Planning Horizon PO WO Sandamp;OP Master Schedule MRP Slide29:  Planning Horizon Sandamp;OP Master Schedule MRP CHANGE When Changes Happen! Run Again Planning & Scheduling Changes:  Planning andamp; Scheduling Changes MRP from Order Point to Rate Based MRP -andgt; Planning Lean -andgt; Execution Slide31:  Final Assy. Schedule Final Assy. Inventory Stocking Point Operation KanBan Signal PULL Methodology Push and Pull Comparison:  Push and Pull Comparison Push Scheduling drives all work to be completed. Work center sends next work center an order when it is completed. It is assumed that the next work center will be ready. Pull Work center receives authorization to complete work from downstream users. Parts are not forwarded until they are requested. Pull System Characteristics:  Pull System Characteristics Universal Standardization Visibility Simplicity Standard Lot Sizes Discipline Versatility/Flexibility Flattening the Bill of Materials Objectives of a Pull System:  Objectives of a Pull System Synchronize Material Movement Limit Inventory in WIP Facilitate Process Improvements, and Further Reductions in Inventory Reduce Throughput Time Simplify or Eliminate Documentation Improve Quality Paperwork Impact:  Paperwork Impact Lean’s Impact on Paperwork:  Lean’s Impact on Paperwork By Shifting from a Transaction Base System to Four-Wall System (Backflushing), much of the W/C to W/C Paperwork can be Eliminated. Storeroom Issues are Eliminated Dock to Stock Programs Eliminate 'Incoming Inspection' Backflushing:  Backflushing SHOW OF HANDS:  SHOW OF HANDS Who is doing Backflushing? Backflushing:  Backflushing Four-Wall System Receipts are Recorded Goods are Delivered to Point-of-Use (Fit) They are NOT Subtracted from Inventory until They Leave in the Form of Finished Goods Slide40:  Backflushing Demo Demo BOM:  Final Product Part A Part B Demo BOM Before (Without Backflushing):  Receiving/Inspection/Stores WIP Issue 2 3 1 4 5 6 8 10 11 12 9 14 7 13 WIP Before (Without Backflushing) After (with Backflushing):  WIP After (with Backflushing) POU Receipt Scrap To FG Accurate BOM No Substitute Parts 'Short' Throughput Time Criteria for Backflushing:  Criteria for Backflushing Dock to Stock Quality Programs Short Throughput Time (Measured in Hours, not Weeks) 100% Accurate BOM No Part Substitutions Process Scrap Tickets Frequently (At least Daily) Conclusions:  Conclusions Conclusions:  Conclusions Lean Strategies Work Best in a High Volume, Low Variety Repetitive/Continuous Flow Business Environments. Batch Companies (Position 2) Have the Most Opportunities for Large Savings When Implementing Lean by Shifting from Batch to Continuous Flow Lean Strategies can be Employed in Any Type of Company Conclusions:  Conclusions When Implementing Lean, Change ERP to Rate Based Demand Change Long-Term Communications to Suppliers Lean Equals Pull System Backflushing is a Lean Technique that is Designed to Save Paperwork and Eliminate Transaction Steps The End:  The End Thank You! G. L. (Jerry) Kilty, CFPIM, CIRM [email protected]

Related presentations


Other presentations created by Alien

Physical Security Lecture
05. 01. 2008
0 views

Physical Security Lecture

GREEK THEATRE
15. 10. 2007
0 views

GREEK THEATRE

Singapore National Symbols
14. 09. 2007
0 views

Singapore National Symbols

Origins of the Cold War
23. 12. 2007
0 views

Origins of the Cold War

CG43SlideSet
30. 04. 2008
0 views

CG43SlideSet

kaiser pres
28. 04. 2008
0 views

kaiser pres

GoldDifferences
22. 04. 2008
0 views

GoldDifferences

visn8
17. 04. 2008
0 views

visn8

Nov24 Regulatory approaches
16. 04. 2008
0 views

Nov24 Regulatory approaches

dr rom
14. 04. 2008
0 views

dr rom

file 6943
13. 04. 2008
0 views

file 6943

The Peak Oil Context Tom Petrie
10. 04. 2008
0 views

The Peak Oil Context Tom Petrie

H106g
09. 04. 2008
0 views

H106g

JapaneseGeography
07. 04. 2008
0 views

JapaneseGeography

Hamburg 2007
14. 09. 2007
0 views

Hamburg 2007

lfg
14. 09. 2007
0 views

lfg

Eddie Final Presentation
14. 09. 2007
0 views

Eddie Final Presentation

chalmers
14. 09. 2007
0 views

chalmers

The Rain Forest Final
14. 09. 2007
0 views

The Rain Forest Final

ECAKnowledgeFair
12. 10. 2007
0 views

ECAKnowledgeFair

Ch18part1
15. 10. 2007
0 views

Ch18part1

WNV AVB 02212006
21. 10. 2007
0 views

WNV AVB 02212006

giraffe pp
14. 09. 2007
0 views

giraffe pp

giraffe powerpoint
14. 09. 2007
0 views

giraffe powerpoint

giraffe
14. 09. 2007
0 views

giraffe

COOL STUFF ABOUT GIRAFFES
14. 09. 2007
0 views

COOL STUFF ABOUT GIRAFFES

ub041104
23. 10. 2007
0 views

ub041104

STORY OF THEME AND PLOT
23. 10. 2007
0 views

STORY OF THEME AND PLOT

PhiladelphiaZooPPP
14. 09. 2007
0 views

PhiladelphiaZooPPP

qu10 11
01. 12. 2007
0 views

qu10 11

Angelos CME Energetics
02. 11. 2007
0 views

Angelos CME Energetics

pptPanama s
22. 10. 2007
0 views

pptPanama s

hirotani
13. 11. 2007
0 views

hirotani

bon2003 mpls
29. 10. 2007
0 views

bon2003 mpls

PROF AZZA
23. 10. 2007
0 views

PROF AZZA

Fenton
29. 10. 2007
0 views

Fenton

Countering Offshore
29. 12. 2007
0 views

Countering Offshore

walters082902
23. 11. 2007
0 views

walters082902

razbash
26. 11. 2007
0 views

razbash

DVMRPandMOSPF
01. 01. 2008
0 views

DVMRPandMOSPF

One 783Ngupta
04. 01. 2008
0 views

One 783Ngupta

Chapter 18 PPT
22. 10. 2007
0 views

Chapter 18 PPT

History of NAIS John Wiemers
20. 08. 2007
0 views

History of NAIS John Wiemers

BSP2D
14. 09. 2007
0 views

BSP2D

costarica1 ftparraud
22. 10. 2007
0 views

costarica1 ftparraud

mcmc2000a
06. 11. 2007
0 views

mcmc2000a

050317lc
16. 11. 2007
0 views

050317lc

ALA2003 OAI
04. 10. 2007
0 views

ALA2003 OAI

fwing
22. 10. 2007
0 views

fwing

acute 060727 transfusionmed
23. 10. 2007
0 views

acute 060727 transfusionmed

bckexpk3b
09. 07. 2007
0 views

bckexpk3b

anorexia
09. 07. 2007
0 views

anorexia

070207 Adjektiv
09. 07. 2007
0 views

070207 Adjektiv

A Brachmann
09. 10. 2007
0 views

A Brachmann

mueller jun07
19. 10. 2007
0 views

mueller jun07

Late Classic Maya Collapse
16. 02. 2008
0 views

Late Classic Maya Collapse

ISLAS GALAPAGOS
14. 09. 2007
0 views

ISLAS GALAPAGOS

Heatingoilwebsection ppp
24. 02. 2008
0 views

Heatingoilwebsection ppp

PIndustrialTrucks
26. 02. 2008
0 views

PIndustrialTrucks

ethanap
14. 09. 2007
0 views

ethanap

Propulsion CEV
07. 11. 2007
0 views

Propulsion CEV

MichelleWatt
20. 02. 2008
0 views

MichelleWatt

newsletterfall04
11. 03. 2008
0 views

newsletterfall04

EC T9 2008 Conference Proposal
12. 03. 2008
0 views

EC T9 2008 Conference Proposal

drugstatistics
17. 12. 2007
0 views

drugstatistics

icfa chep06
23. 10. 2007
0 views

icfa chep06

Hubert CW8
14. 09. 2007
0 views

Hubert CW8

A mi Papi 2089
19. 06. 2007
0 views

A mi Papi 2089

An ode to Mothers
19. 06. 2007
0 views

An ode to Mothers

LoffPresentation
17. 10. 2007
0 views

LoffPresentation

Maschera
19. 06. 2007
0 views

Maschera

manual
19. 06. 2007
0 views

manual

Luces De Navidad 1848
19. 06. 2007
0 views

Luces De Navidad 1848

leer
19. 06. 2007
0 views

leer

lexisnexis
05. 10. 2007
0 views

lexisnexis

OAT Presentation v5
19. 06. 2007
0 views

OAT Presentation v5

moscatelli
19. 06. 2007
0 views

moscatelli

moon split
19. 06. 2007
0 views

moon split

money plus
19. 06. 2007
0 views

money plus

MKCL
19. 06. 2007
0 views

MKCL

Journey of the Spirit Lesson 6
01. 10. 2007
0 views

Journey of the Spirit Lesson 6

2 Jornada BISHOP
10. 10. 2007
0 views

2 Jornada BISHOP

No esperes
19. 06. 2007
0 views

No esperes

Amores locos 1992
19. 06. 2007
0 views

Amores locos 1992

College English book 2 Unit 7
24. 02. 2008
0 views

College English book 2 Unit 7

A vista de pajaro II 2109
19. 06. 2007
0 views

A vista de pajaro II 2109

Ammosov Vladimir ammosov pra
12. 10. 2007
0 views

Ammosov Vladimir ammosov pra

Amber la mejor de todas
19. 06. 2007
0 views

Amber la mejor de todas

CP317 lecture 6 Huck II 05
11. 12. 2007
0 views

CP317 lecture 6 Huck II 05

AHQA031204Mck
09. 07. 2007
0 views

AHQA031204Mck

Evergreen
03. 01. 2008
0 views

Evergreen

04 NJIT3
02. 01. 2008
0 views

04 NJIT3

Poster A4 Glasgow nov04
04. 10. 2007
0 views

Poster A4 Glasgow nov04

Ally McBeal
09. 07. 2007
0 views

Ally McBeal

sara paige
14. 09. 2007
0 views

sara paige

36181003
24. 10. 2007
0 views

36181003

MusicApprecBaroque 2
22. 11. 2007
0 views

MusicApprecBaroque 2

ELE386 Malware
20. 08. 2007
0 views

ELE386 Malware

RohanShah
12. 10. 2007
0 views

RohanShah

1022MAS net big picture
03. 01. 2008
0 views

1022MAS net big picture

Lo Suficiente 1744
19. 06. 2007
0 views

Lo Suficiente 1744

gm3 jp item14 Mangrove ITTO
22. 10. 2007
0 views

gm3 jp item14 Mangrove ITTO

2005AuditResults
09. 07. 2007
0 views

2005AuditResults

HABIC1 summary
17. 11. 2007
0 views

HABIC1 summary

aro ald informalsession
24. 10. 2007
0 views

aro ald informalsession

etu ambassadeurs juin 07 en
13. 03. 2008
0 views

etu ambassadeurs juin 07 en

Gobert poster
03. 10. 2007
0 views

Gobert poster

Kistenev
15. 11. 2007
0 views

Kistenev

6 History of Chemistry I
12. 10. 2007
0 views

6 History of Chemistry I

Jan2000report
04. 01. 2008
0 views

Jan2000report

course 4
03. 01. 2008
0 views

course 4