Linking Land Use and Water Supply Planning

Information about Linking Land Use and Water Supply Planning

Published on November 1, 2007

Author: VolteMort

Source: authorstream.com

Content

Linking Land Use and Water Supply Planning:  Linking Land Use and Water Supply Planning 2002 Legislation:  2002 Legislation Infrastructure Element: By January 1, 2005, or the EAR due date, whichever comes first, the element must consider the regional water supply plan. It must include a work plan, covering at least a 10-year period, for building water supply facilities for which the local government is responsible to serve existing and new development. 2002 Legislation:  2002 Legislation EAR: The evaluation must consider the regional water supply plan. The potable water element must be revised to include a work plan, covering at least a 10-year period for building water supply facilities for which the local government is responsible to serve existing and new development. Why Were Additional Water Supply Planning Requirements Adopted?:  Why Were Additional Water Supply Planning Requirements Adopted? Population growth: from 15.9 million today to 21.8 million in 2020 Increased demand for water: demand projected to increase by 26.4% to 9.1 bgd Fastest increase in public water supply Why Were Additional Water Supply Planning Requirements Adopted?:  Why Were Additional Water Supply Planning Requirements Adopted? Existing sources will not be adequate to meet projected demand 1997: Legislature required regional water supply plans for areas where traditional sources of water would be inadequate by 2020 Historically severe drought 2000 - 2001 Regional Water Supply Plans (RWSP):  Regional Water Supply Plans (RWSP) Contain a list of water source options which will meet anticipated demands while sustaining water resources and related natural systems By August 2001, all RWSP complete for NWFWMD, SJRWMD, SWFWMD, and SFWMD SRWMD sources adequate so no RWSP Water Management Districts:  Water Management Districts Water Supply Sources:  Water Supply Sources New well fields Increased use of reclaimed water Storage reservoirs Surface water withdrawal Aquifer storage and recovery Reverse osmosis/desalination Conservation Challenges for the Future:  Challenges for the Future Implementation of RWSP through Five-Year Water Resource Development Work Programs Water Conservation Initiative Linking growth with water supply Comprehensive Plans Evaluation and Appraisal Reports 10-Year Work Plans Updating RWSPs every 5 years Who Must Prepare 10-Year Water Supply Work Plan?:  Who Must Prepare 10-Year Water Supply Work Plan? Initially, only local governments having responsibility for all or a portion of their water supply facilities and located within a RWSP area must prepare by Jan 1, 2005, or EAR due date, which occurs first Eventually, all local governments having water supply responsibilities must prepare 10-year work plan Must prepare as part of EAR-based amendments What Amendments Are Required?:  What Amendments Are Required? The infrastructure element must be amended to consider the RWSP The infrastructure element must be amended to include at least a10-year work plan for water supply facilities for which the local government has responsibility The capital improvements element must be amended to include any captial improvements needed during the first 5 years Corollary Requirements:  Corollary Requirements Due during EAR update Amend conservation element to assess water needs and sources considering RWSP or district water management plan Amend intergovernmental coordination element to show coordination of the comp plan with RWSP Local governments encouraged to make amendments at same time as 10-year work plan Requirements for LGs with Different Levels of Responsibility :  Requirements for LGs with Different Levels of Responsibility LG has responsibility for all water supply facilities Project need for at least 10-years Develop at least 10-year work plan Amend infrastructure element to show consideration of RWSP and incorporate 10-year work plan Amend CIP to include capital improvements needed during first 5 years Encouraged to also amend conservation and intergovernmental coordination elements Requirements for LGs with Different Levels of Responsibility:  Requirements for LGs with Different Levels of Responsibility LG has no responsibility for any of its water supply facilities Project needs for at least 10-years Coordinate with water supplier to ensure need can be met with respect to infrastructure and sources, considering RWSP Coordinate with WMD regarding ability of water supplier to meet need Letter to DCA and supporting documentation from water supplier confirming need can be met Requirements for LGs with Different Levels of Responsibility:  Requirements for LGs with Different Levels of Responsibility LG has responsibility for a portion of water supply facilities (commonly distribution system) Project need for at least 10-years and develop work plan for facilities for which responsible, considering RWSP Amend infrastructure element and CIP; encouraged to also amend conservation and ICE elements Coordinate with water supplier to ensure need can be met with respect to infrastructure and sources, considering RWSP Coordinate with WMD regarding ability of water supplier to meet need Letter to DCA and supporting documentation from water supplier confirming need can be met Work Plan Amendment Data and Analysis:  Work Plan Amendment Data and Analysis Identify facilities for which responsible wells, surface water intake points, treatment and storage facilities, major distribution lines Design capacity Current demand Geographic area served Permit conditions and duration Facility capacity analysis by geographic service area Existing conditions, population served, level of service Work Plan Amendment Data and Analysis:  Work Plan Amendment Data and Analysis Conditions 5 and 10 years into future, noting capacity surpluses and deficiencies Identify water supply facilities needed Prioritize capital projects needed to serve projected 10-year needs and include first 5 year in CIP Consider RWSP regarding projected needs and sources Coordinate closely with WMD for data and analysis, and consideration of RWSP Work Plan Amendment Adopted Components:  Work Plan Amendment Adopted Components List of water facilities needed in priority order for at least next 10 years For each facility: Anticipated year of construction Water source to be utilized Estimated cost Source of funds Facilities needed during first 5 years adopted into CIP Work Plan Amendment Adopted Components:  Work Plan Amendment Adopted Components Revisions to infrastructure element to reflect consideration of RWSP Amendments to conservation and ICE elements encouraged as part of work plan amendment; will be required as part of EAR update Pilot Communities:  Pilot Communities Will go first to help identify: Common problems LGs will face Issues relating to unique situations Data and analysis needs How DCA, DEP, and WMDs can best help Five pilot communities, one in each WMD City of Venice (SWFWMD) Palm Beach County (SFWMD) City of Cocoa (SJRWMD) City of Lakeland (SRWMD) Okaloosa County (NWFWMD) Contacts:  Contacts DCA: Mike McDaniel 850-922-1806 [email protected] Walker Banning (SRWMD) 850-922-1785 [email protected] Richard Deadman (SWFWMD)850-922-1770 [email protected] Bob Dennis(SFWMD) 850-922-1765 [email protected] Ana McGuinness (SJRWMD) 850-922-1802 [email protected] Mark Neuse (NWFWMD) 850-922-1798 [email protected] Contacts:  Contacts DEP: Janet Lewellyn 850-488-2118 [email protected] South Florida WMD: Henry Bittaker 561-682-6792 [email protected] St. Johns River WMD: Jeff Cole 386-329-4497 [email protected] Southwest Florida WMD: Richard Owen 352-796-7211 [email protected] Suwannee River WMD: David Still 386-362-1001 [email protected] Northwest Florida WMD: Tyler Macmillan 850-539-5999 [email protected] Questions:  Questions

Related presentations


Other presentations created by VolteMort

Global Supply Chain
13. 04. 2008
0 views

Global Supply Chain

Green Accounting CT 2006
18. 04. 2008
0 views

Green Accounting CT 2006

Chapter 01
10. 04. 2008
0 views

Chapter 01

jmkfah
09. 04. 2008
0 views

jmkfah

climate and science 07
07. 04. 2008
0 views

climate and science 07

2006080708
26. 03. 2008
0 views

2006080708

wcor06
21. 03. 2008
0 views

wcor06

FP7 MTAPU
18. 03. 2008
0 views

FP7 MTAPU

apostles symbols
16. 08. 2007
0 views

apostles symbols

Your First Flex Application
28. 11. 2007
0 views

Your First Flex Application

G070221 00
28. 11. 2007
0 views

G070221 00

how we help you become pregnant
03. 12. 2007
0 views

how we help you become pregnant

greenfieldlrp
03. 10. 2007
0 views

greenfieldlrp

ch4
16. 11. 2007
0 views

ch4

Habitat El Bosque Tropical
20. 11. 2007
0 views

Habitat El Bosque Tropical

ghostgirl
21. 11. 2007
0 views

ghostgirl

serious blow
16. 08. 2007
0 views

serious blow

Gospel
16. 08. 2007
0 views

Gospel

Jesus Feeds 5000
16. 08. 2007
0 views

Jesus Feeds 5000

Exegeting Jesus Parables
16. 08. 2007
0 views

Exegeting Jesus Parables

KNEZEVIC Desimir
04. 10. 2007
0 views

KNEZEVIC Desimir

week9
14. 12. 2007
0 views

week9

coldwar
19. 12. 2007
0 views

coldwar

icde07 hagonzal
23. 11. 2007
0 views

icde07 hagonzal

organic solvents
30. 12. 2007
0 views

organic solvents

ID172 LOGANALY
31. 12. 2007
0 views

ID172 LOGANALY

Meconium
04. 01. 2008
0 views

Meconium

dutch history fo rdummies
11. 12. 2007
0 views

dutch history fo rdummies

life cycle
09. 08. 2007
0 views

life cycle

2006Stats RRT C 5 3
09. 08. 2007
0 views

2006Stats RRT C 5 3

Ethical Issues at End of Life
09. 08. 2007
0 views

Ethical Issues at End of Life

Lecturx7
09. 08. 2007
0 views

Lecturx7

ESI toolkit
07. 11. 2007
0 views

ESI toolkit

Sure of faith
16. 08. 2007
0 views

Sure of faith

HARTLEY WSOWS 20040204
05. 09. 2007
0 views

HARTLEY WSOWS 20040204

Biodiesel web
09. 11. 2007
0 views

Biodiesel web

csce520 lect2
16. 11. 2007
0 views

csce520 lect2

SM Aula 8 v3
28. 12. 2007
0 views

SM Aula 8 v3

33Chris
04. 01. 2008
0 views

33Chris

Celebration of life martha
09. 08. 2007
0 views

Celebration of life martha

life as an astronomer
09. 08. 2007
0 views

life as an astronomer

Ilene Lewis
09. 08. 2007
0 views

Ilene Lewis

Deep Drill Active HT2
09. 08. 2007
0 views

Deep Drill Active HT2

issues
28. 12. 2007
0 views

issues

families
24. 02. 2008
0 views

families

2005 OSD CAIG Presentation
04. 03. 2008
0 views

2005 OSD CAIG Presentation

sears techmission values2005
16. 08. 2007
0 views

sears techmission values2005

GSutter ppts
24. 06. 2007
0 views

GSutter ppts

griffiths LD summit 08nov06 post
24. 06. 2007
0 views

griffiths LD summit 08nov06 post

Griffiths D4L 26apr07 v2
24. 06. 2007
0 views

Griffiths D4L 26apr07 v2

Charlotte English FINAL
12. 03. 2008
0 views

Charlotte English FINAL

FOREIGN POLICY 1920s 1930s
14. 03. 2008
0 views

FOREIGN POLICY 1920s 1930s

Florence Labord Moodle
24. 06. 2007
0 views

Florence Labord Moodle

Einführung MKT Übungen
24. 06. 2007
0 views

Einführung MKT Übungen

kt cohort seminars sep20 2006
24. 06. 2007
0 views

kt cohort seminars sep20 2006

Karpati EPICT Final Review
24. 06. 2007
0 views

Karpati EPICT Final Review

JCampbell ppt
24. 06. 2007
0 views

JCampbell ppt

Boise Police 2 1 05
06. 11. 2007
0 views

Boise Police 2 1 05

Cheryl Keenan COABE 050505
09. 08. 2007
0 views

Cheryl Keenan COABE 050505

Lum db v1
16. 08. 2007
0 views

Lum db v1

2007 April Poll Powerpoint
05. 09. 2007
0 views

2007 April Poll Powerpoint

Viennot
02. 10. 2007
0 views

Viennot

EUROPEAN E INVESTOR 20040921
03. 10. 2007
0 views

EUROPEAN E INVESTOR 20040921

PulmonaryThromboembo lism
19. 11. 2007
0 views

PulmonaryThromboembo lism

Raffle Pandemic Flu Planning
05. 09. 2007
0 views

Raffle Pandemic Flu Planning

Face
11. 10. 2007
0 views

Face

navypowerpt
30. 11. 2007
0 views

navypowerpt

IHSLG CPD ERes RCSI 07
24. 06. 2007
0 views

IHSLG CPD ERes RCSI 07

retreat petery
16. 08. 2007
0 views

retreat petery

Open Day talk StudentLife
05. 12. 2007
0 views

Open Day talk StudentLife

LSIDs
09. 08. 2007
0 views

LSIDs

HF diff
16. 08. 2007
0 views

HF diff

IKT taikymas pradiniame ugdyme
24. 06. 2007
0 views

IKT taikymas pradiniame ugdyme

Dylan Symposium Presentation
09. 08. 2007
0 views

Dylan Symposium Presentation

Are We There Yet
16. 08. 2007
0 views

Are We There Yet

h0ykom ren
24. 06. 2007
0 views

h0ykom ren

hAykom ren
24. 06. 2007
0 views

hAykom ren

Halton Data Fair Winner MsNeilly
09. 08. 2007
0 views

Halton Data Fair Winner MsNeilly

careers 07
09. 08. 2007
0 views

careers 07

IBC05B
02. 01. 2008
0 views

IBC05B

Eating the Elephant
26. 11. 2007
0 views

Eating the Elephant

LSLR pt2
09. 08. 2007
0 views

LSLR pt2

pgeog251 ch18 af
27. 11. 2007
0 views

pgeog251 ch18 af

henny eyova
24. 06. 2007
0 views

henny eyova

ksypolitos SCH TelematicServices
24. 06. 2007
0 views

ksypolitos SCH TelematicServices

Morgan town 2007
09. 08. 2007
0 views

Morgan town 2007

IMS State of Open Source 0606
24. 06. 2007
0 views

IMS State of Open Source 0606

h dillon training shoestring
24. 06. 2007
0 views

h dillon training shoestring

Click on SUNY for internetII
05. 09. 2007
0 views

Click on SUNY for internetII

kruul
24. 06. 2007
0 views

kruul

228 210 RSCEast PowerPressed
24. 06. 2007
0 views

228 210 RSCEast PowerPressed

kanayama
24. 06. 2007
0 views

kanayama

Businessplan NYSERnet
05. 09. 2007
0 views

Businessplan NYSERnet

gse program
24. 06. 2007
0 views

gse program

ica 20105 cert 2 it 2007
24. 06. 2007
0 views

ica 20105 cert 2 it 2007

Mukherjee sbatransition
09. 08. 2007
0 views

Mukherjee sbatransition

Kinsinger VA
09. 08. 2007
0 views

Kinsinger VA

ALA05O lszewski
29. 11. 2007
0 views

ALA05O lszewski

lec12 04 lcca
09. 08. 2007
0 views

lec12 04 lcca

I GIG2
16. 08. 2007
0 views

I GIG2