NCMA Presentation

Information about NCMA Presentation

Published on October 22, 2007

Author: Abhil

Source: authorstream.com

Content

SeaPort Enhanced :  SeaPort Enhanced Carrie Bender Head of Acquisition Naval Undersea Warfare Center Division Keyport 19 May 2004 By: Outline Background Acquisition Strategy Administration & Usage Concept of Operation Points of Contact FOR: National Contract Management Association, West Sound Chapter SERVICES SPEND CONTROL:  SERVICES SPEND CONTROL NAVSEA, the largest of the Navy’s five systems commands, obligated $17B in FY03 We obligate over $2B/yr in services, with over $1.5B of that occurring among the Warfare Centers There has historically been little visibility at the Navy and DoD levels of how these services dollars are spent Section 801(b) of the FY2002 Defense Appropriations Act was implemented on 1 October 2003, restricting the flow of services acquisition funding to non-DoD contracting entities BACKGROUND:  BACKGROUND Under the CNO’s 2004 guidance for implementing the SEA Enterprise portion of the Sea Power 21 Philosophy, there is emphasis on finding further efficiencies in our business processes. Among NAVSEA Commander, Vice Admiral Phil Balisle’s current initiatives in carrying out this mission, is to expand SEAPORT so that the web-based portal and acquisition strategy is available to the Warfare Centers and other NAVSEA Activities. Building on an Original:  Building on an Original Problem: Hundreds of contracts for similar services with overlaps in contractor community, perceived as labor intensive and redundant Problem: No consistent corporate acquisition strategy Problem: Services spend information and opportunity for leveraged savings very limited at the corporate level Answer: Use the Original NAVSEA SeaPort contract as a model for incorporating a wider range of services, and build in more utility for the Warfare Centers. SeaPort I:  SeaPort I Award of SeaPort I – 1 April 2001 to 21 MACs HQ centered Professional Support Services Contained a rolling admissions clause, caps on fees and pass throughs, and a guaranteed savings clause for the conversion of tasks to performance based Savings estimated at 7-10% on previous acquisitions and immeasurable process savings – in some cases 25-30% Over $50M ≈ 70 days Under $50M ≈ 35 days SeaPort–e Strategy:  SeaPort–e Strategy Nationwide contracts for all Warfare Center service requirements Seven geographical zones Task Orders to be competed in the Zone corresponding to the Principle Place of Performance Contractors awarded MACs within single or multiple Zones NSWC Dahlgren is the current contracting office for the MAC, however each task must be competed by the activity that has the requirement While non-mandatory, NAVSEA and Warfare Center leadership have stressed the importance of use CONTRACT CHARACTERISTICS:  CONTRACT CHARACTERISTICS Five year base and two five year Award Terms - Total of 15 years Task orders that invoke Service Contract Act provisions must limit that effort to five years Only one MAC award per Company Rolling Admissions - the Government reserves the right to review the contracts annually to determine whether it would be appropriate to announce a new competition for the purpose of adding additional ID/IQ holders. Cost and Fixed priced task orders permitted No Time and Material orders. No undefinitized orders. CONTRACT REQUIREMENTS:  CONTRACT REQUIREMENTS Research and Development Support Engineering, System Engineering and Process Engineering Support Modeling, Simulation, Stimulation, and Analysis Support Prototyping, Pre-Production, Model-Making, and Fabrication Support System Design Documentation and Technical Data Support Software Engineering, Development, Programming, and Network Support Reliability, Maintainability, and Availability (RM&A) Support Human Factors Engineering Support System Safety Engineering Support Configuration Management (CM) Support Quality Assurance (QA) Support Information System (IS) Development, Information Assurance (IA) and Information Technology (IT) Support Ship Inactivation and Disposal Support Interoperability, Test and Evaluation, Trials Support Measurement Facilities, Range, and Instrumentation Support Acquisition Logistics Support Supply and Provisioning Support Training Support In-Service Engineering, Fleet Introduction, Installation and Checkout Support Program Support Administration Support WARFARE CENTER ZONES:  WARFARE CENTER ZONES Zone One – Northeast  NUWC Newport  NSWC SSES Philadelphia Zone Two – National Capital  NSWC Carderock  NSWC Dahlgren  NSWC Indian Head Zone Three – Mid-Atlantic  NSWC Dam Neck Zone Four – Gulf Coast  NSWC Panama City Zone Five – Midwest  NSWC Crane Zone Six – Southwest  NSWC Port Hueneme  NSWC Corona Zone Seven – Northwest  NUWC Keyport GEOGRAPHICAL ZONES:  GEOGRAPHICAL ZONES WHY A ZONE APPROACH?:  WHY A ZONE APPROACH?  Preserves local vendor base  Encourages Small Business participation  Reduces the need for complicated Teaming arrangements Allows for easier contract organization/ administration (SCA, rolling admissions, small business goals, incorporation of local site provisions) ROLLING ADMISSIONS:  ROLLING ADMISSIONS MAC awards to new companies may be made when it is determined that a specific Zone(s) has met the criteria Common criteria Small Business Participation (Lesson Learned from SeaPort) All requirements are fulfilled Quality of performance by each Prime Additional scopes of effort are required The need to increase the ceiling value of the contracts Number, value and complexity of work assigned to each Prime Adequate competition Transaction costs for issuing orders Common schedule to evaluate criteria Admissions may be opened for select groups of requirements only or types of business, e.g. small business SMALL BUSINESS STRATEGY:  SMALL BUSINESS STRATEGY Zone based strategy encouraged small business participation at prime level 68% of MAC Awards to Small Businesses (103 of 151) MAC Small Business goals: 33% of obligated dollars will be awarded to small business primes 20% of obligated dollars to large businesses will be subcontracted to small business Subcontract performance a factor in Task Order evaluations and Award Term decisions Specific subcontracting goals and actuals should be obtained on each TO SMALL BUSINESS STRATEGY:  SMALL BUSINESS STRATEGY Each Task Order reviewed by cognizant Deputy for Small Business for potential set asides Government will reserve the right to set aside any requirement – must be noted in the TO Solicitation Two Types of Set Asides Complete Set Aside – 100% SB Set Aside Cascading Set Asides – If the Government receives at least two proposals from small businesses, the Task Order will be set aside for only Small Business 8(a) Set Asides and SBIRs should not be awarded through SeaPort THE PORTAL:  THE PORTAL Developed in 2001 for SeaPort and enhanced in 2004 for SeaPort-e Fully integrated, secure, on-line, e-commerce tool Available from any internet enabled computer in the world - fully NMCI compliant Must register - www.seaport.navy.mil Developed and managed by Aquilent Complete process – requirements determination through close-out Solicitations are posted to “Auction Services” Phase II of SeaPort-e enhancements includes interface to SPS-PD2 ZONE 7 CONTRACTORS:  ZONE 7 CONTRACTORS American Systems Corporation Gray Hawk Systems, Inc. Research & Deveopment Sol. AMSEC, LLC Gryphon Technologies, LC Resource Consultants, Inc. Anteon Corporation ICI, LLC Scientific Research Corp. BAE Applied Technologies Identix Public Sector, Inc. Solutions Dev. Corp. BearingPoint Integrated Consulting Services Southeastern Computer BecTech Integrits Stanley Associates Booz Allen Hamilton John J. McMullen Associates, Inc. Systems Engineering Assoc. CACI Life Cycle Engineering, Inc. Systems Engineering, Inc CDI Marine Company Lockheed Martin IS, Inc. Tecnico Corp. CSC LPI Technical Services Technology Service Corp. Dynaflow, Inc ManTech Systems Eng. Corp. Thomas Associates, Inc. Dynamics Research Corporation Matrix Engineers Titan Corp. EDO Corporation Millennium Eng. Co. Trandes Corp. EG&G Technical Services, Inc. Northrup Grumman DMS, Inc. Tri Star Engineering Engineering Services Network, Inc. Ocean Systems Eng. Corp. TSM Corp. Envisioneering, Inc. Open Systems Sciences TWD & Associates, Inc. General Dynamics Q.E.D. Systems, Inc. VSE Corp. George G. Sharp, Inc. Raytheon Tech. Services Co. PRIME CONTRACTORS – ALL ZONES ZONE 7 CONTRACTORS:  ZONE 7 CONTRACTORS PRIME CONTRACTORS – ZONE 7 Advanced Acoustic Concepts Advanced Solutions for Tomorrow American Management Systems Assett AMEWAS Computer Products, Inc. DDLOmni Engineering ELS, Inc. MAR Range Services McLaughlin Research Corp. MTC Services Corp Orbis, Inc. Planning Systems, Inc. Raydar & Associates, Inc. Williamson & Associates, Inc. Workflow Systems, LLC 36- Small Business 32-Large Business CONCEPT OF OPERATIONS:  CONCEPT OF OPERATIONS ROLES AND RESPONSIBILITIES:  ROLES AND RESPONSIBILITIES OMBUDSMAN EACH ACTIVITY HAS APPOINTED AN OMBUDSMAN. THE OMBUDSMAN WILL REVIEW COMPLAINTS FROM THE CONTRACTORS AND ENSURE THAT ALL CONTRACTORS ARE AFFORDED A FAIR OPPORTUNITY TO BE CONSIDERED, CONSISTENT WITH THE TERMS AND CONDITIONS OF THE CONTRACT ROLES AND RESPONSIBILITIES:  ROLES AND RESPONSIBILITIES LIST OF OMBUDSMEN ROLES AND RESPONSIBILITIES:  ROLES AND RESPONSIBILITIES ZONE COORDINATOR EACH ZONE SHALL APPOINT A ZONE COORDINATOR (ZC) TO SERVE AS A LOCAL SEAPORT-E POINT OF CONTACT. THE ZC SHALL ACT AS A LIAISON WITH THE ZONE’S VENDOR COMMUNITY, MONITOR SMALL BUSINESS PARTICIPATION, AND PROVIDE THE PRIMARY INPUT TO THE SEAPORT-E COUNCIL IN REGARDS TO THE OPENING OF ROLLING ADMISSIONS FOR THAT PARTICULAR ZONE. THE ZC SHALL ALSO ESTABLISH A ZONE BUSINESS COUNCIL TO PROVIDE A FORUM FOR INDUSTRY INVOLVEMENT AND FEEDBACK. THIS COUNCIL WILL NOT SERVE AS A FORUM FOR SPECIFIC TASK ORDER DISPUTES (WHICH SHOULD BE MADE TO THE CONTRACTING OFFICER OR OMBUDSMAN), BUT INSTEAD PROVIDE GENERAL PROGRAM DIRECTION. IN THOSE INSTANCES WHERE TWO OR MORE ACTIVITIES EXIST IN A ZONE, THOSE ACTIVITIES SHALL DECIDE ON A ZONE COORDINATOR BY CONSENSUS. IN THE EVENT THAT SUCH CONSENSUS CANNOT BE REACHED, THE DEPUTY COMMANDER/EXECUTIVE DIRECTOR FOR CONTRACTS (SEA 02/02B) SHALL MAKE SUCH APPOINTMENT. ROLES AND RESPONSIBILITIES:  ROLES AND RESPONSIBILITIES SEAPORT E-COUNCIL THE SEAPORT-E COUNCIL (SC) SHALL BE THE BOARD RESPONSIBLE FOR PROGRAMMATIC DECISIONS. MEMBERSHIP SHALL BE MADE UP OF EACH ZONE COORDINATOR, THE SEAPORT-E CONTRACTING OFFICER, A REPRESENTATIVE OF SEA 02, THE NAVSEA DIRECTOR FOR SMALL AND SMALL DISADVANTAGED BUSINESS UTILIZATION (ADVISORY ROLE), AND ANY OTHER MEMBER DECIDED UPON BY THE SC. THE SC SHALL ALSO DECIDE THE ESTABLISHMENT OF ROLLING ADMISSIONS, AND SERVE AS THE AWARD TERM BOARD. THE SC SHALL CONVENE NOT LESS THAN EVERY SIX MONTHS, BUT NEED NOT MEET IN PERSON. ROLES AND RESPONSIBILITIES:  ROLES AND RESPONSIBILITIES TASK ORDER MANAGERS UNDER A TRADITIONAL CONTRACT, THE CONTRACTING OFFICER MAY APPOINT A CONTRACTING OFFICER’S REPRESENTATIVE (COR). UNDER SEAPORT-E, THE CONTRACTING OFFICER FOR EACH TASK ORDER MAY APPOINT A TASK ORDER MANAGER (ToM). THE ToM SHALL BE CONSIDERED A COR, AND MUST BE IDENTIFIED IN BOTH THE PORTAL AND TASK ORDER FOR WHICH THEY ARE BEING APPOINTED. ToM’s MUST BE APPOINTED USING THE SAME PROCEDURES FOR APPOINTING COR’s, (INCLUDING TRAINING, CERTIFICATION, APPOINTMENT LETTERS, ETC.). EACH CONTRACTING OFFICE MUST KEEP A MASTER LIST OF CERTIFIED AND APPOINTED ToM’s. CONOPS STRUCTURE:  CONOPS STRUCTURE The Activity’s Deputy for Small Business must review each task order prior to solicitation. Contracting Officers are encouraged to use the Performance Based contract provisions of the MAC’s. For those task orders that are not performance based, waivers must be approved in accordance with NAVSEA policy. The award of task orders should only be made for known requirements. Task orders may not be awarded for requirements that are not defined or used as larger umbrella vehicles for work to be defined later. Therefore, task orders may not be issued as BPA’s, BOA’s, or ID/IQ’s. Technical Instructions may only be issued to provide further guidance on a defined scope of work, and may not be used to direct work. The E-portal must be used for task order issuance CONOPS STRUCTURE:  CONOPS STRUCTURE The SeaPort-e PCO is the only authorized individual able to add team members to the SeaPort-e MAC’s, in accordance with the Contract terms. MAC holders must communicate directly with the PCO for any changes in team composition. Task orders shall be solicited in the Zone corresponding to the principal place of performance for the services acquired. Solicitations should not be limited to the Zone corresponding to location of the Warfare Center, but instead to the place of performance. Past performance information will be submitted at the MAC level by the SeaPort-e PCO. Each task order will have its own Task Order Performance Evaluation (TPOE) completed throughout the period of performance. Individual task order PCO’s must ensure the timely submission of the TOPE. e-PORTAL:  e-PORTAL PORTAL LOG-IN:  PORTAL LOG-IN PORTAL DOCUMENT LIBRARY:  PORTAL DOCUMENT LIBRARY PORTAL PACKAGE VIEW:  PORTAL PACKAGE VIEW PORTAL – PR WIZARD:  PORTAL – PR WIZARD PORTAL CONTRACT INFORMATION:  PORTAL CONTRACT INFORMATION PORTAL PRICING STRUCTURE:  PORTAL PRICING STRUCTURE PORTAL AUCTION SERVICES:  PORTAL AUCTION SERVICES PORTAL - EVALUATIONS:  PORTAL - EVALUATIONS seaport.navy.mil:  seaport.navy.mil CONTACTS:  CONTACTS PCO – NSWC Dahlgren. E-mail: [email protected] Zone 7 Zone Coordinator: Carrie Bender E-mail: [email protected] NUWC Division Keyport Small Business Deputy: Nicky Champion E-mail: [email protected] Ombudsman: LCDR Boris Belchoff E-mail: [email protected]

Related presentations


Other presentations created by Abhil

oyster culture
03. 01. 2008
0 views

oyster culture

laser
02. 05. 2008
0 views

laser

electricity project
10. 10. 2007
0 views

electricity project

CAPM Nt
28. 04. 2008
0 views

CAPM Nt

futures
16. 04. 2008
0 views

futures

601presentation
29. 09. 2007
0 views

601presentation

RJ Iris Equity Seminar
03. 10. 2007
0 views

RJ Iris Equity Seminar

bubbles
03. 10. 2007
0 views

bubbles

weather jeopardy spanish
07. 10. 2007
0 views

weather jeopardy spanish

pc03
09. 10. 2007
0 views

pc03

IVACS2006 handout
09. 10. 2007
0 views

IVACS2006 handout

06 collaborating to improve ell
10. 10. 2007
0 views

06 collaborating to improve ell

lj
13. 10. 2007
0 views

lj

4bTheNobelPrizeinChe mistry2004
15. 10. 2007
0 views

4bTheNobelPrizeinChe mistry2004

Lecture 1 Darwin vs God
15. 10. 2007
0 views

Lecture 1 Darwin vs God

endangeredspecies ppt
12. 10. 2007
0 views

endangeredspecies ppt

mtom
24. 10. 2007
0 views

mtom

scaling
19. 10. 2007
0 views

scaling

p10
23. 10. 2007
0 views

p10

2007 Applicant Demographics
30. 10. 2007
0 views

2007 Applicant Demographics

WNV
21. 10. 2007
0 views

WNV

cells
20. 11. 2007
0 views

cells

conclusiones V1 sep28 2007
25. 10. 2007
0 views

conclusiones V1 sep28 2007

ap Cold War 07
23. 12. 2007
0 views

ap Cold War 07

10 Review
29. 12. 2007
0 views

10 Review

Isle Royale Simulation
01. 01. 2008
0 views

Isle Royale Simulation

structengr
04. 01. 2008
0 views

structengr

2005 02 07 Could Al Qaeda Win
07. 01. 2008
0 views

2005 02 07 Could Al Qaeda Win

td06030
15. 10. 2007
0 views

td06030

I DESC Japan
09. 10. 2007
0 views

I DESC Japan

section5 lec2
13. 11. 2007
0 views

section5 lec2

205w
03. 01. 2008
0 views

205w

Ceiling Fan Sales Training
23. 10. 2007
0 views

Ceiling Fan Sales Training

v war stuntman
19. 02. 2008
0 views

v war stuntman

HIMARS ENGLISHLANGUAGE
04. 03. 2008
0 views

HIMARS ENGLISHLANGUAGE

ING NYC Marathon 2007
12. 03. 2008
0 views

ING NYC Marathon 2007

K ICMCI as an NGO
20. 03. 2008
0 views

K ICMCI as an NGO

CPB750 TXT
03. 04. 2008
0 views

CPB750 TXT

Unit 4 Japan s Geography 1
07. 04. 2008
0 views

Unit 4 Japan s Geography 1

neither shall the sword
27. 02. 2008
0 views

neither shall the sword

solka fml 4 15 06 dj final
15. 11. 2007
0 views

solka fml 4 15 06 dj final

coface07
13. 04. 2008
0 views

coface07

AMurcko
17. 04. 2008
0 views

AMurcko

FACS borenstein Dec03
22. 04. 2008
0 views

FACS borenstein Dec03

mhtb
07. 11. 2007
0 views

mhtb

ç
10. 10. 2007
0 views

ç

Retroviruses105
15. 10. 2007
0 views

Retroviruses105

Krajweski Chapter 15 16
07. 05. 2008
0 views

Krajweski Chapter 15 16

0916 Branch 0730
02. 10. 2007
0 views

0916 Branch 0730

Lec5 3rd
30. 04. 2008
0 views

Lec5 3rd

pp angel cristian
01. 10. 2007
0 views

pp angel cristian

Guy Wormser
23. 10. 2007
0 views

Guy Wormser

From the Inside Looking Out
02. 05. 2008
0 views

From the Inside Looking Out

26 ple edgecock
17. 10. 2007
0 views

26 ple edgecock

rcdt 061127 05
10. 10. 2007
0 views

rcdt 061127 05

CAISModelGreenSchool
07. 03. 2008
0 views

CAISModelGreenSchool

Ordinamento Germania
16. 11. 2007
0 views

Ordinamento Germania

20041005 Adam Posen
09. 10. 2007
0 views

20041005 Adam Posen

A71 Quezada
01. 11. 2007
0 views

A71 Quezada

CAMET Report
22. 10. 2007
0 views

CAMET Report

workbench
08. 10. 2007
0 views

workbench

melderichtlinien
05. 10. 2007
0 views

melderichtlinien

APAN E culturePresentation 1 21
30. 10. 2007
0 views

APAN E culturePresentation 1 21

ANGELImplementationa tLCCC
01. 10. 2007
0 views

ANGELImplementationa tLCCC

Options Questionnaire 12 11 02
29. 10. 2007
0 views

Options Questionnaire 12 11 02

cancer nutri
04. 10. 2007
0 views

cancer nutri

SYSTEM 3 presentation
27. 09. 2007
0 views

SYSTEM 3 presentation

Souza parallel 3 1
12. 10. 2007
0 views

Souza parallel 3 1

Memorial 2007
18. 10. 2007
0 views

Memorial 2007

SIEl 2006
24. 10. 2007
0 views

SIEl 2006