Reqmts Sched Procurmt Spamp

Information about Reqmts Sched Procurmt Spamp

Published on November 15, 2007

Author: abdullah

Source: authorstream.com

Content

Mercury Intense Target (MERIT) Final Design Review:  Mercury Intense Target (MERIT) Final Design Review Design Approach, Requirements, Schedule, and Procurement P.T. Spampinato V.B. Graves T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion Center October 17-19, 2005 Design Review Covers Remainder of the Hg Delivery System (… the syringe pump is being procured):  Design Review Covers Remainder of the Hg Delivery System (… the syringe pump is being procured) Cutaway views of the target system Design Approach – Two Design Packages to Expedite Procurement:  Design Approach – Two Design Packages to Expedite Procurement (1) Syringe Pump Syringe pump design replaced the original centrifugal pump due to the high pressure requirement for the system to deliver a 20 m/s jet Two hydraulic cylinders drive a Hg cylinder Stainless vs carbon steel cylinders Procurement underway at BNL and the vendor has been chosen (2) Target Delivery System Consists of primary and secondary containments, supports, sump tank, instruments, filtered vent, supply line, laser optic windows, and beam windows Procurement in November using BNL procurement process What is the MERIT?:  What is the MERIT? The Hg Intense Target (MERIT) is part of the proof-of-principle experiment to investigate the interaction of a proton beam, high magnetic field, and free-jet Hg target Slide5:  Target Containment is Designed To Meet ISO 2919 per CERN ISO 2919 “Classification of Sealed Source Performance” Table 2, Class 2 Temperature: 40º C (20 minutes); 80º C (1 hour) (by analysis) External Pressure: 25 kPa absolute (60 psi) to atmospheric (for the primary containment only, incl. quartz windows? – by analysis) Impact: 50 grams from 1 meter, or equivalent imparted energy (P.C.-quartz windows – test?; S.C.-Lexan® panel and sleeve – test?) Vibration: 3 times 10 minutes, 25-500 Hz at 49 m/s2 (5 gn, acceleration maximum amplitude) (n/a) Puncture: 1 gram from 1 meter, or equivalent imparted energy (sleeve – test?) Design Approach (cont.):  Design Approach (cont.) Pump equipment and target delivery system are designed at ORNL Funding is provided for design, assembly, and testing Procure all hardware thru BNL (except for misc. items) Assemble equipment and test the system at ORNL/TTF Characterize operating parameters of the target equipment and the laser diagnostic (pictures of Hg jet) Ship the target to MIT along with auxiliary equipment, and support base structure Integrated system tests at MIT (w/ solenoid) Characterize operating parameters in the magnetic field environment (pictures of Hg jet in high field) Fit up test of solenoid/target equipment on base support structure Ship back to ORNL – current recommendation by the ORNL Transportation Group Ship to CERN along with all support equipment Beam-on-target tests at CERN Proof-of-principal tests in TT2A tunnel, store, decon, pack, and Ship mildly activated equipment plus Hg back to ORNL Reqmts and Operating Conditions::  Reqmts and Operating Conditions: 1-cm diameter jet at 20 m/s delivered every 30 minutes >1-sec steady state jet during the magnet peak field Full-beam interaction length is 30-cm 24 GeV, 1 MW proton beam, <20x1012 ppp Beam line is 120-cm (47.2”) above the tunnel floor Up to 100 pulses for the CERN test, >500 operating cycles for system testing The pump equipment operates in a range of 6000 Gauss to 300 Gauss (1 Tesla = 104 Gauss) Target system must deliver a stable, unconstrained jet of Hg in 1-atmosphere of air, into a 15 Tesla field Magnetic Field Profile:  Magnetic Field Profile 15 Tesla peak field has a 1-sec flat top at t = 9.5 s Peak Field Stray field profile Geometry of the Interaction Region:  Geometry of the Interaction Region 0.4° horizontal kick Jet to beam is 33 millirad (1.89°); jet to magnetic axis is 100 millirad (5.73°) The PB crosses the jet centerline at Z=0, which is also at 15 T in the center of the solenoid Containment Schematic:  Containment Schematic Operational Requirements (cont.):  Operational Requirements (cont.) Target system (wetted) materials shall be stainless steel 316 or 304; other materials shall be non-magnetic, i.e., the aluminum base support Gaskets/seals shall be non-reactive with Hg and radiation tolerant to 104 rads (prelim. estim.) Nominal operating temperature of the Hg is 25°C Installation/alignment: target probe axis into solenoid bore, concentric within ±1.0 mm position target/solenoid assembly to beam line within ±0.5 mm (fiducials are to be located from the solenoid) Project Schedule:  Project Schedule Assemble syringe pump and target hardware May 2006 Target system tests at ORNL Jul-Aug 2006 Integrated system tests at MIT Sep-Oct 2006 Beam-on-target experiment at CERN Mar-Apr 2007 Procurement Plan:  Procurement Plan Procurement will be handled thru BNL since ORNL funding is limited to equipment design, assembly, and testing Complete the Final Design Review – in process Update design – next week Write a fabrication specification that consists primarily of Solid Works® drawings – two weeks Send specifications to BNL - before the end of November Delivery of target system hardware including support structure to ORNL - spring 2006 Conclusions:  Conclusions Procurement for delivery has slipped ~ 1 month Not a problem; sufficient slack in schedule Syringe pump system contract awarded – BNL Delivery system procurement to BNL before the end of November Target system is on schedule to meet April 2007 testing at CERN

Related presentations


Other presentations created by abdullah

TheLittleRedHen ReadersTheater
04. 10. 2007
0 views

TheLittleRedHen ReadersTheater

flexenergypresentati on
28. 11. 2007
0 views

flexenergypresentati on

Yoga and Stress Management
05. 12. 2007
0 views

Yoga and Stress Management

Ethanol Process Tour pps
07. 11. 2007
0 views

Ethanol Process Tour pps

0830
07. 11. 2007
0 views

0830

SkyMotion
13. 11. 2007
0 views

SkyMotion

lect16
16. 11. 2007
0 views

lect16

HPKB coas
09. 11. 2007
0 views

HPKB coas

OFC presentation
17. 12. 2007
0 views

OFC presentation

EId Mubark
20. 12. 2007
0 views

EId Mubark

FArmEquipment
29. 12. 2007
0 views

FArmEquipment

Vincent 2007
31. 12. 2007
0 views

Vincent 2007

DRC Presentation
07. 01. 2008
0 views

DRC Presentation

Patents presentationLibMar07
01. 11. 2007
0 views

Patents presentationLibMar07

01 VisualBasic2005
28. 11. 2007
0 views

01 VisualBasic2005

future of incarceration
28. 09. 2007
0 views

future of incarceration

2008GeneralVegetable Culture
04. 03. 2008
0 views

2008GeneralVegetable Culture

DODA Exec Seminar
06. 03. 2008
0 views

DODA Exec Seminar

XLT
10. 03. 2008
0 views

XLT

marsh presentation
12. 03. 2008
0 views

marsh presentation

Open Days
14. 03. 2008
0 views

Open Days

spotkania warsztaty mazowsze
18. 03. 2008
0 views

spotkania warsztaty mazowsze

WP1
21. 03. 2008
0 views

WP1

2jpn e
27. 03. 2008
0 views

2jpn e

Birding in Maine
07. 04. 2008
0 views

Birding in Maine

beckwith whois workshop 24jun03
02. 10. 2007
0 views

beckwith whois workshop 24jun03

bagshaw relevance
30. 03. 2008
0 views

bagshaw relevance

likenootherbusiness
13. 04. 2008
0 views

likenootherbusiness

personalfinance
03. 10. 2007
0 views

personalfinance

Krase Part 1
27. 09. 2007
0 views

Krase Part 1

informe muerte
06. 11. 2007
0 views

informe muerte

Balogh
30. 12. 2007
0 views

Balogh

WeOPC15 03 Noriyo Kaneko
23. 12. 2007
0 views

WeOPC15 03 Noriyo Kaneko

div7k train
26. 02. 2008
0 views

div7k train

Tab 3 NCS
29. 12. 2007
0 views

Tab 3 NCS