thetis

Information about thetis

Published on October 31, 2007

Author: Columbia

Source: authorstream.com

Content

AVM case studies for Public Transport: innovative applications in Italy:  AVM case studies for Public Transport: innovative applications in Italy Marino Mazzon, Commercial Manager Thetis S.p.A., Venice, Italy www.thetis.it BITS, Bridging the European ITS Business Co-operation with China Shanghai, 3-5 March, 2003 Summary:  Summary The Venice experience: a multi-user system The Rome experience: a scalable system associated to the payment scheme The Milan experience: a waste collection management system case studies: systems supplied by Thetis, using Transmodel:  systems supplied by Thetis, using Transmodel Rome, Jubilee Lines 110 buses Rome, East Lines 132 buses Rome, West Lines 132 buses Rome, South Lines 130 buses Vicenza, extra-urban buses 230 buses Parma, urban buses 170 buses Milan, waste collection trucks 600 trucks case study one: Orion, to manage transport in Venice:  case study one: Orion, to manage transport in Venice features: multiuser architecture a service company experience: five years The “Orion” multiuser system:  The “Orion” multiuser system the service provider: positioning and fleet management data, turnkey maintenance data: localization, environment, territory In-field communication via radio or GSM, GPRS real time data to users control rooms via ISDN lines The idea is also suited to small size urban areas GPS onboard systems TV cameras Radar, other Territory accessibility Service centre taxi deliveries public transport administration garbage collection emergency Environmental data t r a f f i c users Effects:  Effects Municipality sustainability of urban environment better use of the city and its environment Planning, statistics fleet operators improvement of transport efficiency (scheduling, loading, paths...) improvement of services to users Passengers Better perceived service Access to information The service provider structure:  The service provider structure VHF Radio (2) UHF Radio (1) differential GPS communications database consoles router major users recording LAN meteo DB server WEB server web radar GPS 60 LED panels in town provide next arrival times:  60 LED panels in town provide next arrival times Case study two: fleet management and service quality reporting for the Rome Jubilee and peripheral bus lines (some 500 buses):  Case study two: fleet management and service quality reporting for the Rome Jubilee and peripheral bus lines (some 500 buses) features: GSM communication Event driven system service quality certification experience: two years The basis :  The basis Then an integrated process: Bus service planning Real time GPS Fleet management Change recording Bus log data recording service quality reporting sw invoicing Experience: some 500 buses in Rome Bus operator companies are now paid per km of service performed and documented automatically. Excess delay causes penalty per km. The system:  The system LAN Server Server WS WS authority router WLAN telecom buses stops CDN line . . . . data files GSM/SMS . . . . depot (GPRS) router objectives:  objectives Real time fleet management Passenger information: onboard: automatic visual and audio announcements at the stops: automatic messages, next arrival time Periodical automatic reporting on service quality (actual versus planned), for invoicing purposes Arrival time messages at 125 stops are updated via GSM :  Arrival time messages at 125 stops are updated via GSM Case study three: waste collection in Milan (some 650 trucks):  Case study three: waste collection in Milan (some 650 trucks) features: GPRS communication Event driven system optimization of post-service street maintenance experience: two years Slide15:  GPRS data, voice GPRS Front end History data (XML compressed files): Localisation, dead reckoning Vehicle parameters, alarms Service data (begin/end, where, when, ..) Operators’ data (badge) Findouts log (driver entered events) Service, actual RDBM server GIS, map matching, service reconstr. The PATH system: improving service performance Service, planning comparison Onboard systems for 600 vehicles (HTTP clients) GPS HP Netserver SUN Solaris Enterprise 420R The onboard system:  The onboard system Removable part: Integrated PC/driver terminal. Can be mounted on any vehicle: self reconfiguration. Can be quickly substituted to grant system availability. Fixed part: Vehicle identification device. Antennas, cables. A possibility: urban integrated management of transport service :  A possibility: urban integrated management of transport service A city is a unique “system” the central administration can be willing to optimise transport services to: Reduce expenses reducing wasted km Reduce environmental impact Hence, a centralised service centre and an open, scalable architecture. Services: Public transport Garbage collection Freight services Emergency services

Related presentations


Other presentations created by Columbia

Electrical motors
14. 11. 2007
0 views

Electrical motors

Plant Adaptations
23. 11. 2007
0 views

Plant Adaptations

Davis powerpoint
03. 10. 2007
0 views

Davis powerpoint

8 1 intro unix
29. 11. 2007
0 views

8 1 intro unix

model
07. 12. 2007
0 views

model

Coparmex Laboral Yanis Raptis
11. 12. 2007
0 views

Coparmex Laboral Yanis Raptis

moodys 1
26. 10. 2007
0 views

moodys 1

Careers English
05. 11. 2007
0 views

Careers English

Ford Carter 1975 1980
07. 11. 2007
0 views

Ford Carter 1975 1980

Nitrogen Asphyxiation Bulletin
12. 11. 2007
0 views

Nitrogen Asphyxiation Bulletin

Class10
16. 11. 2007
0 views

Class10

Susantha Bangkok Bioethics
21. 11. 2007
0 views

Susantha Bangkok Bioethics

rciabc en
21. 11. 2007
0 views

rciabc en

SMMGEuler
30. 12. 2007
0 views

SMMGEuler

mod18 1
01. 01. 2008
0 views

mod18 1

RICGPSlideshow
03. 01. 2008
0 views

RICGPSlideshow

Space Wortzel
03. 01. 2008
0 views

Space Wortzel

CTSAs Today Part 3 Wall
04. 01. 2008
0 views

CTSAs Today Part 3 Wall

Nano Paris Oct2006 a5
07. 01. 2008
0 views

Nano Paris Oct2006 a5

vote Verification Sherman GWU
07. 01. 2008
0 views

vote Verification Sherman GWU

pocketcheffmkt
12. 12. 2007
0 views

pocketcheffmkt

ABSLec5
27. 09. 2007
0 views

ABSLec5

Rain Drops
03. 10. 2007
0 views

Rain Drops

04 Livestock Contributions
26. 11. 2007
0 views

04 Livestock Contributions

exor sigcomm
23. 12. 2007
0 views

exor sigcomm

Ici
20. 02. 2008
0 views

Ici

Family and Social Change
24. 02. 2008
0 views

Family and Social Change

InventorsWorkshop042 006
27. 02. 2008
0 views

InventorsWorkshop042 006

Lewis ISDS 2007stp
27. 03. 2008
0 views

Lewis ISDS 2007stp

Neu259 2006 2 photon
20. 11. 2007
0 views

Neu259 2006 2 photon

ASI Presentation
28. 11. 2007
0 views

ASI Presentation

MonetaryPolicyInChina
13. 04. 2008
0 views

MonetaryPolicyInChina

Team Tracer Presentation
14. 11. 2007
0 views

Team Tracer Presentation

NISL History current2
30. 10. 2007
0 views

NISL History current2

Hewitt
02. 10. 2007
0 views

Hewitt

Schmidt
08. 11. 2007
0 views

Schmidt

marineFallOffDuty
06. 11. 2007
0 views

marineFallOffDuty

muzi
29. 10. 2007
0 views

muzi

patty abramson russian
01. 10. 2007
0 views

patty abramson russian

tufts web
19. 11. 2007
0 views

tufts web

WkshpPres
26. 11. 2007
0 views

WkshpPres

2 06 dela croce
05. 11. 2007
0 views

2 06 dela croce

RenaissanceArt
31. 10. 2007
0 views

RenaissanceArt

Gautam Handout
28. 12. 2007
0 views

Gautam Handout

WillgerodtAllRoads
01. 11. 2007
0 views

WillgerodtAllRoads

Planning Change 5C2
01. 12. 2007
0 views

Planning Change 5C2

Moving with EUROUSA
06. 11. 2007
0 views

Moving with EUROUSA