ustman

Information about ustman

Published on November 9, 2007

Author: Altoro

Source: authorstream.com

Content

Rhode Island’s Underground Storage Tank Program:  Rhode Island’s Underground Storage Tank Program RI Department of Environmental Management Disclaimer:  Disclaimer The purpose of this session is to provide you with a general overview of certain regulatory requirements. As such, the remarks offered by DEM representatives are merely intended as opinions, offered to assist you in understanding how the regulations may be applied in general. These opinions should not be taken as attempts to apply the regulations to specific factual scenarios. They are offered without familiarity with all of the facts presented by a given situation and, therefore, you should not act in sole reliance upon the opinions provided. Specific questions about the application of environmental regulations to individual cases should be directed to the Department’s Office of Technical & Customer Assistance, or to the Office of Waste Management, UST Section. Nothing said today should be taken as binding upon the Department; either the Department’s interpretation of applicable regulations, or any policy which may have developed applying those regulations. What is a UST?:  What is a UST? 10% or more of its volume (including piping) is underground Holds petroleum product or hazardous material Also includes holding tanks serving floor drains Why regulate USTs?:  Why regulate USTs? Small leaks of gasoline or hazardous material from USTs can contaminate large groundwater supplies Leaks can also create health and fire hazards in nearby buildings Program History:  Program History First RI UST regulations issued in 1984; amended in 1985, 1989, 1992, & 1993 Federal UST rules first issued in 1988; financial responsibility requirements in 1989 Purpose of program is to minimize and detect releases through proper operation and maintenance of existing facilities; and to prevent future releases through technical standards for new installations, replacements, and upgrades Program History (cont’d.):  Program History (cont’d.) 1985 rules required new installations to be corrosion protected, and continuously monitored; included alternatives required spill and overfill protection allowed single-walled tanks and piping set upgrade requirement for existing UST systems Program History (cont’d.):  Program History (cont’d.) 1992 rules required all new installations to use double-walled, corrosion protected tanks; and piping with continuous interstitial monitoring required registration of commercial heating oil tanks DEM program received EPA approval in 1992 Program Elements:  Program Elements UST Registration Existing System Requirements leak detection O&M/record-keeping abandonment prohibition Upgrading Requirements New/Replacement Tank Standards/Approvals tank closure cathodic protection Interior lining UST Professional Certification Financial Responsibility Exempted Tanks (partial list):  Exempted Tanks (partial list) hydraulic lift tanks basement tanks (specific criteria) septic tanks flow-through process tanks (as defined) propane or LNG tanks intermittent or fill and draw tanks emergency spill protection & overflow tanks UST Registration:  UST Registration Commercial USTs of any size storing motor fuel or hazardous materials must be registered with DEM includes waste oil USTs includes holding tanks serving floor drains USTs storing fuel oil for heating commercial facilities must be registered UST Registration (cont’d.):  UST Registration (cont’d.) Annual fee- $50 per tank; DEM issues annual certificate Application provides information on tank system age, construction, contents and ownership DEM must be notified 30 days prior to proposed transfer of ownership Residential tanks 1100 gallons storing fuel oil for on-site heating are exempt Existing System Requirements:  Existing System Requirements Definition- existing systems defined as being in operation prior to October 31, 1984 USTs installed in compliance with the 1985 rules must be continuously monitored, and do not require upgrade Leak Detection for Tanks (for existing systems):  Leak Detection for Tanks (for existing systems) Continuous monitoring double-walled> interstitial monitoring single-walled> approved ATG Tightness testing schedule based on age of tank results must be submitted to DEM testers and methods must be certified by DEM Must also conduct Daily Inventory and Monthly Reconciliation Leak Detection for Piping (for existing systems):  Leak Detection for Piping (for existing systems) Double-walled systems must install continuous interstitial monitoring Single-walled systems pressurized systems require annual tests and line leak detector suction systems require testing schedule based on age Operation & Maintenance (existing systems):  Operation & Maintenance (existing systems) Monitoring systems must be calibrated and tested annually, per manufacturer Monitoring systems must be operating at all times any deactivation must be reported immediately repair within 15 days, or temporarily close Records must be kept on-site, unless approval for an alternate site is obtained from DEM Must conform with National Codes of Practice Abandonment Prohibition:  Abandonment Prohibition Abandonment means the relinquishment or termination of possession, ownership or control of USTs, by vacating or by disposition, without meeting the closure requirements...; or the action of taking a UST or UST system out of operation for a period of greater than 180 consecutive days without the prior permission of the Director... No UST may be abandoned- there are no exceptions Extensions may be granted on a case-by-case basis (temporary closure) Early Upgrade Requirements:  Early Upgrade Requirements Spill containment required on all registered USTs since January 1, 1993 three gallon capacity above-ground fills exempt Overfill protection required on all tanks since January 1, 1996 fuel oil consumed on-site for heat exempt three options- automatic, flow restriction, or alarm; or equivalent 1998 Upgrade Deadline- Corrosion Protection for Tanks and Piping:  1998 Upgrade Deadline- Corrosion Protection for Tanks and Piping Options: close USTs/replace with new cathodic protection interior lining- lining only requires a variance; none yet granted Don’t wait ‘til 98! New Tank Standards:  New Tank Standards Application must be submitted to DEM Must be approved before installation New UST facilities may not be constructed in wellhead protection areas (replacement tanks are allowed) Substantial modifications of UST systems must also be pre-approved USTs serving floor drains have special requirements New Tank Standards (cont’d.):  New Tank Standards (cont’d.) Tanks must be double-walled, with continuous interstitial monitoring Piping must be double-walled, with continuously monitored containment sump, and tested before backfilling UL or ULC listed, National Codes of Practice Entire system precision tested upon installation Leak detection system must be approved by DEM, and maintained properly Spill containment and overfill protection required Tank and piping must be compatible with contents General Approval Process:  General Approval Process Submit scope of work to DEM 30 days in advance Notify DEM 48 hours prior to installation Written approval from DEM required prior to commencement of work (including product piping replacement) All work must be performed in accordance with industry standards Precision test tank upon completion Written verification of completion within 15 days Installation Paperwork:  Installation Paperwork completed registration application detailed site plan (plans for new facilities require PE stamp) including location of: all tanks and piping dispensing units groundwater monitoring wells water table elevation public water supply wells or reservoirs within 400’ facilities served by private wells within 200’ proposed and existing buildings and associated structures boundaries of the facility north arrow Installation Paperwork (cont’d.):  Installation Paperwork (cont’d.) cross-sectional view of the tank depth of excavation bedding thickness backfill depth supports and anchorage used dimensions and thickness of traffic pad Installation Paperwork (cont’d.):  Installation Paperwork (cont’d.) Equipment list and written description tank(s) piping leak monitoring systems spill/overfill protection methods corrosion protection methods operation and maintenance requirements for any of the above Post-Installation Paperwork:  Post-Installation Paperwork for tank and/or piping replacement, submit: tank tightness test results (tank and separate line test) certification form (available from DEM) copy of tank/piping manufacturer’s installation checklist Tank Closure:  Tank Closure Closure of commercial tanks must be pre-approved by DEM $75 application fee DEM conducts inspection of excavation must schedule closure inspection All releases must be reported immediately to DEM, local water supply (if sensitive area), and local fire authority Tank Closure (cont’d.):  Tank Closure (cont’d.) Residues must be managed appropriately must be transported off-site by permitted hazardous waste transporter Tank must be cut/cleaned per Fire Marshal’s regulations Closure Assessment report required except when fuel oil used solely on-site must be performed by PE or CPG Closures-in-place only approved under special conditions Cathodic Protection:  Cathodic Protection Required for both tanks and piping Impressed current or sacrificial anode systems allowed Internal inspection must be performed or certified by NACE corrosion expert- no alternatives at this time Upgrade must be designed by same DEM requires work scope and design to be submitted with NACE certification list of equipment/materials/warranties site plan Precision tested upon completion Submit as-builts, test results and affidavits within 15 days Cathodic Protection O&M:  Cathodic Protection O&M Systems must be operated, maintained, and inspected in accordance with National Codes of Practice Precision testing schedule is not affected by installation of corrosion protection unless continuous monitoring is installed upgraded USTs can use tightness testing and inventory control for ten years after date of upgrade Cathodic Protection O&M (cont’d.):  Cathodic Protection O&M (cont’d.) Must be tested by qualified cathodic protection tester within six months of installation, and at least every three years following Also must be tested whenever construction or maintenance in the area of the structure occurs Impressed current systems must also be inspected every 60 days to ensure equipment is running properly, and tank-to-soil potential reading relative to copper is -850 millivolts, or more negative After Installing Cathodic Protection:  After Installing Cathodic Protection submit tank tightness test results assessment of the structural soundness of the tank post-construction as-built drawings which include: location of all tanks and dispensers materials of construction piping layout wiring schematic products stored After Installing Cathodic Protection (cont’d.):  After Installing Cathodic Protection (cont’d.) Submit post-construction data re: tank-to-soil potentials pipe-to-soil potentials dielectric isolation foreign structure-to-soil potentials test coupons permanent reference electrodes Interior Lining:  Interior Lining DEM only accepts direct internal inspection, per API 631, NLPA 1631- no alternatives New ASTM standards are not acceptable Must submit proposal which outlines scope of work, including: list of equipment/materials/warranties site plan qualification of person who is applying the lining method of evaluating the tank interior After Interior Lining-:  After Interior Lining- submit tank tightness test results assessment of the structural soundness of the tank summary of the testing of the lining material holiday testing barcol hardness UST Professional Certification:  UST Professional Certification Individuals who conduct precision tests must now be licensed by DEM Installers must be licensed by RI Dept. of Labor/Division of Professional Regulation, and certified by applicable equipment manufacturers DEM encourages voluntary efforts by UST installers, removers, and corrosion protection experts to obtain certification from a non-profit testing agency- the International Fire Code Institute we hope to make this certification mandatory UST Financial Responsibility:  UST Financial Responsibility Commercial gasoline USTs, and some others, must demonstrate financial responsibility for managing releases Several allowable mechanisms, including a financial test and private insurance UST Financial Responsibility (cont’d.):  UST Financial Responsibility (cont’d.) Another mechanism, a state UST FR Fund, was established by the General Assembly in July 1994 Program is not yet operating- will reimburse eligible costs related to investigation and remediation of UST releases USTs must be in compliance with UST rules $20,000 deductible; $1,000,000 coverage Rules to be promulgated by UST Fund Review Board draft is now available from the Board Hazardous materials USTs not eligible Questions and Answers:  What type of electronic monitoring is required for piping replacement only? The tank top piping sump is required to be continuously monitored, for both pressurized and suction systems. Heating oil consumed on-site for heating purposes is exempt. Questions and Answers Questions and Answers (cont’d.):  Questions and Answers (cont’d.) When is the continuous electronic monitoring system required to be activated? Prior to commencing regular UST operation. Can existing steel piping be upgraded? Not really. Existing unprotected steel piping should be replaced with new compliant piping (USTs holding fuel oil for on-site heating purposes only are exempt). Final Thoughts:  Final Thoughts Expecting an extension to the 1998 deadline?- Forget about it! Pursue IFCI certification Any questions? Call us at-:  Any questions? Call us at- 222-OTCA (6822) Tom Epstein- ext. 7501 fax 222-3810 UST Program 222-2797 Greg Yekhtikian- ext. 7521 fax 222-3813 or visit the Office of Technical & Customer Assistance at our new home-:  or visit the Office of Technical & Customer Assistance at our new home- 235 Promenade Street Providence, RI 02908 first door on left from the Beach Street entrance

Related presentations


Other presentations created by Altoro

Robot Different Types
07. 01. 2008
0 views

Robot Different Types

guzman
18. 04. 2008
0 views

guzman

PublicFinancevsPubli cChoice
13. 04. 2008
0 views

PublicFinancevsPubli cChoice

2779JacobFrenkel
10. 04. 2008
0 views

2779JacobFrenkel

Chapter 02 Warming the Earth
07. 04. 2008
0 views

Chapter 02 Warming the Earth

ElectronicRetailersA ssociation9
27. 03. 2008
0 views

ElectronicRetailersA ssociation9

mining
26. 03. 2008
0 views

mining

Austria
21. 03. 2008
0 views

Austria

poc presentationv ny
28. 09. 2007
0 views

poc presentationv ny

PPT Jon Sigurdson
12. 10. 2007
0 views

PPT Jon Sigurdson

Workshop Wintersport
12. 10. 2007
0 views

Workshop Wintersport

2006 2007 Calender
06. 09. 2007
0 views

2006 2007 Calender

Protein for Athletes
06. 09. 2007
0 views

Protein for Athletes

a23
12. 09. 2007
0 views

a23

lecture 18 bread fermentation
04. 10. 2007
0 views

lecture 18 bread fermentation

Slavery
11. 12. 2007
0 views

Slavery

The Model Hockey Program
06. 09. 2007
0 views

The Model Hockey Program

WAWF Deployment Review
07. 11. 2007
0 views

WAWF Deployment Review

soybeans2007
07. 11. 2007
0 views

soybeans2007

Association HEP Training
06. 09. 2007
0 views

Association HEP Training

Portion Distortion
12. 09. 2007
0 views

Portion Distortion

compositae2006r
07. 12. 2007
0 views

compositae2006r

The Cold War and Domino Theory
19. 12. 2007
0 views

The Cold War and Domino Theory

nelson NATO
25. 12. 2007
0 views

nelson NATO

Fri 04 Killar
29. 12. 2007
0 views

Fri 04 Killar

Oslo 1
02. 01. 2008
0 views

Oslo 1

fruit diseases05
04. 01. 2008
0 views

fruit diseases05

HARRY S TRUMAN
28. 12. 2007
0 views

HARRY S TRUMAN

hayek45
12. 09. 2007
0 views

hayek45

ETC 2004 10 25
06. 09. 2007
0 views

ETC 2004 10 25

CT303 NetworkingDevices
28. 12. 2007
0 views

CT303 NetworkingDevices

IDIS
10. 12. 2007
0 views

IDIS

lect04Slides
14. 12. 2007
0 views

lect04Slides

missions
24. 02. 2008
0 views

missions

360
12. 09. 2007
0 views

360

3 4apr07 SDD Chief
29. 11. 2007
0 views

3 4apr07 SDD Chief

Talk EX8 6
12. 03. 2008
0 views

Talk EX8 6

LoD
24. 12. 2007
0 views

LoD

Roch Stuart
24. 02. 2008
0 views

Roch Stuart

sp10002 3
19. 02. 2008
0 views

sp10002 3

FY2006TourismMediaPl an
10. 10. 2007
0 views

FY2006TourismMediaPl an

Thompson
12. 09. 2007
0 views

Thompson

SMI Innov
17. 06. 2007
0 views

SMI Innov

Salvo Presentation
17. 06. 2007
0 views

Salvo Presentation

SALTO Inclusion 2005
17. 06. 2007
0 views

SALTO Inclusion 2005

athletics
17. 06. 2007
0 views

athletics

JohnBare 11sept07
04. 12. 2007
0 views

JohnBare 11sept07

pizza talk 2006
12. 09. 2007
0 views

pizza talk 2006

Selectividad2007
17. 06. 2007
0 views

Selectividad2007

Phil Borgeaud final
06. 09. 2007
0 views

Phil Borgeaud final

Chelsie and Samantha
02. 11. 2007
0 views

Chelsie and Samantha

PLVol1
26. 11. 2007
0 views

PLVol1

ACHA Rules of Emphasis 8 12 06
06. 09. 2007
0 views

ACHA Rules of Emphasis 8 12 06

Renuka Ramnath
12. 09. 2007
0 views

Renuka Ramnath

Overview of Japan Steel Industry
09. 10. 2007
0 views

Overview of Japan Steel Industry

the10mostbeautifulsu rahs
02. 10. 2007
0 views

the10mostbeautifulsu rahs

prez2
21. 11. 2007
0 views

prez2

PlanningMinorityComm unities
26. 02. 2008
0 views

PlanningMinorityComm unities

PPT for recruits 03 2
06. 09. 2007
0 views

PPT for recruits 03 2

siklejog2
17. 06. 2007
0 views

siklejog2

Amuse Promotional materials
12. 10. 2007
0 views

Amuse Promotional materials

GDSv15Training
03. 01. 2008
0 views

GDSv15Training